Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Volvo CE’s electric quarry operation commences trials
    August 29, 2018
    Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site
  • Malaga first to trial Kapsch optimiser
    June 29, 2021
    Kapsch TrafficCom has announced that the Spanish city of Málaga is the first European city to test the company’s signaling system and real-time traffic optimiser.
  • LiuGong invests hard to be seen as made, tested and supported in Europe
    January 26, 2018
    LiuGong is investing hard in Europe, determined to be seen as a global player whose products are “made in Europe, tested in Europe and supported in Europe.” Along with new European headquarters based in Warsaw, LiuGong is also opening up a new European production line and a new continent-wide parts distribution centre at its Dressta manufacturing centre in Stalowa Wola. Geoff Hadwick reports
  • CET opens new laboratory to service UK’s infrastructure projects
    October 23, 2017
    With over £300 billion of investment in infrastructure planned over the next four years in the UK, materials testing firm CET is gearing up to service a lot more projects – Kristina Smith visited the newest laboratory near Heathrow to find out more. The CET Group has ambitious plans. Over the next four years it wants to double the size of its business, which in the last year turned over £27 million. “There’s a lot of positivity out there,” said Gary Corrigan, managing director of the group’s infrastructu