Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Building the Pfänder tunnes
    February 10, 2012
    The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.
  • Building the Pfänder tunnes
    April 11, 2012
    The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.
  • Australia tunnel compensation package required?
    January 10, 2019
    The fallback option for a major road and tunnel project in Australia now includes the possible payment of compensation should construction delays hold back its opening. The potential compensation package is being planned by the Victoria State Government to Transurban for Melbourne’s massive US$4.73 billion (A$6.7 billion) West Gate Tunnel project. The size of the compensation fee remains as yet unannounced, although some estimates suggest it could be as high as $1.27 billion (A$1.8 billion). Transurban expe
  • Emovis for Mont Blanc
    May 13, 2025


    Mont Blanc Motorways and Tunnel - ATMB - will have free-flow tolling under a 10-year contract awarded to Emovis, a subsidiary of Abertis Mobility Services.

    Emovis will convert 58km of the A40 motorway in France into a free-flow tolling system the is set to be operational by spring 2027, replacing the current toll plazas. Five bidirectional toll gantries will be installed along the route between the towns of Sallanches and Annemasse.