Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Tunnel linings to order
    July 6, 2012
    A new Liebherr Compactmix 1.0 plant is being used as part of a process in the manufacture of pre-fabricated concrete components. The Compactmix 1.0 compact mixing system was bought by a facility in Türkheim, Germany and its versatility has helped in integrating the unit into the plant's existing production hall. A conveyor belt for the concrete links the mixing system to the prefabricated part production section. The Liebherr ring-pan mixer Type RIM-M is equipped with a mechanical agitator system, and along
  • Keestrack’s hybrid mobile cone crusher H4e electrifies Hillhead
    November 7, 2018
    At this year’s recent Hillhead equipment exhibition, Keestrack introduced into the UK its fully hybrid mobile cone crusher H4e Keestrack says that the highly compact plant with optional integrated pre-screen and three-deck hanging screen offers energy savings in productive secondary or tertiary crushing. Keestrack’s range for quarrying and recycling applications includes more than 20 models, offering production rates from 200-1,200tonnes/hour. Almost all models are available in diesel-electric or full-el
  • Attachment expert FAE expands construction offering
    July 4, 2023
    FAE, which manufactures attachments for skid steers and excavators, is expanding its offering for road construction. The latest addition is to its family of asphalt planers was unveiled for the first time at SaMoTer 2023 in May: a 1m-wide attachment for skid steers, RPL/SSL/DT, which joins FAE’s existing three planers which are 450mm, 600mm and 750mm wide.
  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.