Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • EastLink tollway a winner at the 9th ITS Australia National Awards
    June 4, 2019
    The Freeway Tunnel Ventilation On-Demand System for Melbourne’s EastLink project picked up the top Industry Award category at the recent 9th ITS Australia National Awards Traditional tunnel ventilation systems are inefficient. Fans operate at fixed speed in manual mode or with individual fans programmed to switch on and off at preset times to ensure zero portal emissions with all emissions dispersed via ventilation stacks. EastLink’s new ventilation on demand – VoD - system matches variable speed fan
  • Free flow tolling technology is booming
    April 10, 2013
    Jon Masters reports on the latest moves in the free-flow tolling segment. Free-flow tolling of roads and discrete infrastructure, such as bridges and tunnels, is an area of transportation that appears to be booming. Tolling in general is on the up, often still as a means for funding road projects where public sector budgets can no longer cover the necessary costs, but not exclusively so. Several high profile examples of road user charging for ‘demand management’ – the reduction of congestion as part of a wi
  • US$227.5 million road deals for Seymour
    October 3, 2024
    US$227.5 million road packages will be handled by Seymour Whyte.
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t