Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Telvent wins Brisbane ITS contract
    March 15, 2012
    Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia.
  • New underground road project proposed for Brisbane
    August 19, 2022
    A new underground road project is being proposed for Brisbane.
  • Dana set to buy drive systems segment of Oerlikon Group
    July 31, 2018
    Dana has signed an agreement to purchase the drive systems segment of the Switzerland-based Oerlikon Group for around US$600 million. The deal, pending regulatory approval, is expected to be completed by the end of the first quarter 2019 at the latest. Oerlikon’s drive systems business makes high-precision gears, planetary hub drives for tracked vehicles and products, controls and software that support vehicle electrification across the mobility industry.
  • Yanmar’s new diesels offer high power density and low fuel consumption
    April 23, 2018
    Yanmar’s two latest diesels, the 4TN101 and 4TN107, are said to combine high power density with low fuel consumption. According to Carlo Guidici, sales director for Yanmar Europe: “The engines have 10% lower fuel consumption than the average for the competition.” With power outputs ranging from 90-155kW, the 4.6litre 4TN107 can provide a power density of 33.7kW/litre, which the firm claims is the highest in its class, while it delivers 805Nm of torque. The issue of power density is important and Guidici