Skip to main content

Kapsch for Kekava Bypass

By David Arminas March 6, 2024 Read time: 3 mins
The nearly 18km-long bypass is part of the A7 Bauska Highway, one of Latvia’s busiest roads with an average daily traffic volume of 17,000 vehicles (image © Renars Koris/Latvian State Roads - LVC, Latvijas Valsts Celi)

The Ķekava Bypass - Latvia's first "high-speed road" - opened in October and with it a traffic management system from Kapsch TrafficCom started operation.

The bypass is providing an efficient alternative for motorists travelling between the Latvian capital Riga, on the Baltic Sea, and neighbouring Lithuania to the south. Traffic in the small town of Ķekava is now being reduced.

Meanwhile, Kapsch TrafficCom's cameras, sensors and radar systems, as well as a modern and flexible traffic management software platform are contributing significantly to safety and sustainability along the bypass. "The Ķekava project is not only a milestone for road PPPs [public-private partnerships] and traffic in Latvia, but a testament to the positive influence of state-of-the-art technology on road safety," said Marko Frank, mobility expert and regional sales director at Kapsch TrafficCom.

The nearly 18km-long bypass is part of the A7 Bauska Highway, one of Latvia’s busiest roads with an average daily traffic volume of 17,000 vehicles and up to more than 25,000 at peak periods. The bypass is also designated part of pan-European TEN-T network called route E67 - the Via Baltica (Helsinki – Tallinn–Riga–Panevežys–Kaunas–Warsaw–Prague).

Construction of the €250 million bypass started in 2021 on what is the first highway in Latvia designated a high-speed road; pedestrians, cyclists and slow-moving agricultural vehicles are prohibited. However, pedestrians and cyclists are allowed on the parallel roads.

Kapsch TrafficCom technologies will ensure safe and efficient operation of the Ķekava Bypass for the next 20 years, noted Juris Frīdmanis, general manager of the private partner consortium Kekava ABT. It is monitored 24 hours per day thanks to more than 20 video surveillance cameras, two weather stations, traffic counting sensors, as well as data system analysing the traffic flow. Maximum driving speed on the bypass during the summer has been set at 120kph but reduced to 90kph during winter - October 16 to April 15.

According to the client, the state-owned road management agency Latvian State Roads (LVC, Latvijas Valsts Celi) there are 900 lighting fixtures, 40km of steel and 4km of concrete safety barriers. Noise mitigation solutions such as noise barriers and soil embankments have been implemented along 7.5km of the road as well as 27km of animal fencing.

Innovative materials and technologies have been used in the construction of the bypass. For example, culverts, water drainage pipes and lighting poles made of glass fibre have been used, recycled PET bottles have been used in the production of bridge barriers and sound absorbers made of wood fibre are used in noise barriers.

The consortium Kekava ABT consists of the Luxembourg-based infrastructure fund TIIC 2 S.C.A. SICAR as well as Latvian construction firms AS A.C.B. and CBR SIA Binders. Ķekava Bypass is the first major PPP project in road construction in the Baltics to be implemented according to the design-build-finance-operate model.

The most important criterion in the evaluation of submitted bids was the price, according to LVC. The price aspect had 80% of the overall project cost evaluation, while the remaining 20% covered compliance with various criteria, such as the duration of works, traffic organisation during the works, organisation of routine maintenance, quality and risk management.

Kekava ABT will guarantee that for another five years after the expiry of the PPP contract – 23 years from construction start – the Ķekava Bypass will remain in sufficiently good shape that it will require only daily maintenance works and no capital investment.

For more information on companies in this article

Related Content

  • Hanwha on the Pedemontana Veneta
    November 1, 2022
    The need for a motorway to link the cities of Vicenza and Treviso in northern Italy emerged in the 1970s as the Venetian countryside became increasingly urbanised. Meanwhile, the enlargement of the European Union to the east in the 1990s also brought more traffic across the region
  • Developments in noise-reducing road surfaces
    February 17, 2012
    Mixtures with special additives are being produced for roads, offering noise reduction and aiding recycling. Patrick Smith reports. Noise-reducing road surfacings have been used in motorway construction for some time. But relatively new are noise-optimised surfacings used on roads in towns that do not follow a standard concept.Road trials with these materials have taken place in Germany since 2007 and have been prioritised due to the European Union Guidelines on the Assessment and Management of Environmenta
  • Kapsch Group expands in Romania
    April 26, 2012
    Kapsch Group has signalled major expansion in Romania with the opening of a new, larger branch office, plans to increase the number of employees, and estimated incomes of more than US$20million by 2015.
  • New road links will cut congestion in St Petersburg
    June 20, 2016
    Road building will solve the problem of traffic jams in St Petersburg – Eugene Gerden writes The authorities in Russian city St Petersburg plan to solve the problem of traffic jams in the city during the next few years. The strategy is expected to be achieved through road building and the improvement of transport connections between different districts in the city. Implementation of these plans will take place as part of the decree 355 "Of the Strategy of St Petersburg Economic and Social Development