Skip to main content

Kapsch for Kekava Bypass

By David Arminas March 6, 2024 Read time: 3 mins
The nearly 18km-long bypass is part of the A7 Bauska Highway, one of Latvia’s busiest roads with an average daily traffic volume of 17,000 vehicles (image © Renars Koris/Latvian State Roads - LVC, Latvijas Valsts Celi)

The Ķekava Bypass - Latvia's first "high-speed road" - opened in October and with it a traffic management system from Kapsch TrafficCom started operation.

The bypass is providing an efficient alternative for motorists travelling between the Latvian capital Riga, on the Baltic Sea, and neighbouring Lithuania to the south. Traffic in the small town of Ķekava is now being reduced.

Meanwhile, Kapsch TrafficCom's cameras, sensors and radar systems, as well as a modern and flexible traffic management software platform are contributing significantly to safety and sustainability along the bypass. "The Ķekava project is not only a milestone for road PPPs [public-private partnerships] and traffic in Latvia, but a testament to the positive influence of state-of-the-art technology on road safety," said Marko Frank, mobility expert and regional sales director at Kapsch TrafficCom.

The nearly 18km-long bypass is part of the A7 Bauska Highway, one of Latvia’s busiest roads with an average daily traffic volume of 17,000 vehicles and up to more than 25,000 at peak periods. The bypass is also designated part of pan-European TEN-T network called route E67 - the Via Baltica (Helsinki – Tallinn–Riga–Panevežys–Kaunas–Warsaw–Prague).

Construction of the €250 million bypass started in 2021 on what is the first highway in Latvia designated a high-speed road; pedestrians, cyclists and slow-moving agricultural vehicles are prohibited. However, pedestrians and cyclists are allowed on the parallel roads.

Kapsch TrafficCom technologies will ensure safe and efficient operation of the Ķekava Bypass for the next 20 years, noted Juris Frīdmanis, general manager of the private partner consortium Kekava ABT. It is monitored 24 hours per day thanks to more than 20 video surveillance cameras, two weather stations, traffic counting sensors, as well as data system analysing the traffic flow. Maximum driving speed on the bypass during the summer has been set at 120kph but reduced to 90kph during winter - October 16 to April 15.

According to the client, the state-owned road management agency Latvian State Roads (LVC, Latvijas Valsts Celi) there are 900 lighting fixtures, 40km of steel and 4km of concrete safety barriers. Noise mitigation solutions such as noise barriers and soil embankments have been implemented along 7.5km of the road as well as 27km of animal fencing.

Innovative materials and technologies have been used in the construction of the bypass. For example, culverts, water drainage pipes and lighting poles made of glass fibre have been used, recycled PET bottles have been used in the production of bridge barriers and sound absorbers made of wood fibre are used in noise barriers.

The consortium Kekava ABT consists of the Luxembourg-based infrastructure fund TIIC 2 S.C.A. SICAR as well as Latvian construction firms AS A.C.B. and CBR SIA Binders. Ķekava Bypass is the first major PPP project in road construction in the Baltics to be implemented according to the design-build-finance-operate model.

The most important criterion in the evaluation of submitted bids was the price, according to LVC. The price aspect had 80% of the overall project cost evaluation, while the remaining 20% covered compliance with various criteria, such as the duration of works, traffic organisation during the works, organisation of routine maintenance, quality and risk management.

Kekava ABT will guarantee that for another five years after the expiry of the PPP contract – 23 years from construction start – the Ķekava Bypass will remain in sufficiently good shape that it will require only daily maintenance works and no capital investment.

For more information on companies in this article

Related Content

  • IRF Executives Talks: shaping the future of Intelligent transportation
    August 29, 2024
    Technological advances for the intelligent transportation sector are developing at incredible speed globally. For many leaders in the sector, one of the biggest challenges is how they should use new technology to shape the future of intelligent transportation. SWARCO chief executive, Michael Schuch, put forward his ideas in conversation with IRF Director General Susanna Zammataro ahead of the IRF World Congress in Istanbul in October.
  • New northern relief road for Moscow
    August 20, 2015
    New Concession Company to build northern relief road of Moscow Kutuzov Avenue – Eugene Gerden writes New Concession Company has won a tender for the building of the Northern relief road of Kutuzovsky Avenue, a major radial avenue in the Russian capital Moscow. The firm is part of Leader company (one of Russia's largest management companies), owned by Yuri Kovalchuk, a well-known Russian businessman, who is reportedly close to Russia’s president Vladimir Putin. It is planned that the building of the n
  • EU to invest €4bn in Polish transport projects
    November 22, 2013
    Major Polish transport projects connected to the TEN-T transport network and the Connecting Europe programme are to receive €4 billion of European Union funding. The S3 road from Nowa Sol to Hradec Kralove is among the Polish TEN-T road project works benefiting from the new EU fund. As part of the Connecting Europe Scheme, the €4 billion EU investment will also cover works on two major border road schemes: the S69 road from Bielsko-Biala, and the S61 from Augustow.
  • Brazil roads repaired with Wirtgen equipment
    November 6, 2018
    A large milling machine from Wirtgen has been used to help repair busy roads in the vicinity of São Paulo in Brazil. The roads provide important transport connections as they link São Paulo with Santos, Brazil’s largest port. The Anchieta-Imigrantes highway system provides the main link between the metropolitan region of São Paulo and the port of Santos, the busiest port in Latin America. Construction of the Anchieta highway began in 1947, with Imigrantes following at the start of the 1970s. Today the Anch