Skip to main content

Kapsch equips Olympia Odos motorway with toll rebate stations

Kapsch TrafficCom has equipped the Olympia Odos Greek motorway with 30 free flow rebate stations. The contract was awarded by the Canadian IBI Group, which has a contract with the Apion Kleos Construction joint venture of Olympia Odos. The deal is for Kapsch’s ongoing technical support for service and maintenance based on a yearly agreement. Kapsch says that the 202km Olympia Odos is one of Greece’s most significant motorway concessions, linking the capital Athens with the city of Corinth and Patras
October 1, 2019 Read time: 2 mins
259 Kapsch TrafficCom has equipped the 3286 Olympia Odos Greek motorway with 30 free flow rebate stations.


The contract was awarded by the Canadian IBI Group, which has a contract with the Apion Kleos Construction joint venture of Olympia Odos. The deal is for Kapsch’s ongoing technical support for service and maintenance based on a yearly agreement.

Kapsch says that the 202km Olympia Odos is one of Greece’s most significant motorway concessions, linking the capital Athens with the city of  Corinth and Patras Port.

The planned upgrade offers the first distance-based pricing model in Greece, available to all electronic toll collection users of Olympia Odos. The solution is based on the concept of providing a rebate to road users if they don’t travel the totality of the distance corresponding to an average distance charging zone (the current charging model). This new model is considered a hybrid or rebate system.

The new solution involves equipping 30 entry and exit ramps with full tolling and enforcement stations for detection and classification of passing vehicles. The journeys recorded by the roadside systems are paired with those recorded in conventional toll plazas to calculate the rebate amount.

For more information on companies in this article

Related Content

  • Cummins completes China collection
    November 21, 2018
    Cummins has showcased a full line of China Nonroad Stage IV emissions engines with the unveiling of the upgraded high performance 8.9-litre L series engine. The unit moves up to 298kW with a peak torque of 1800Nm – an 11% increase on its predecessor – and offers class-leading fuel economy and the ability to run at high altitudes while maintaining power capability. Cummins full line-up of engines for the new China Nonroad Stage IV emissions standard spans 2.8 to 15 litres displacement with a power capabili
  • South Africa's world class tollway development
    May 8, 2012
    Part of an extensive motorway network measuring some 185km, the ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system that provides major impetus to socio-economic growth in South Africa's most populous and commercially active region.
  • Hydrogen engines from Hyundai
    March 1, 2023
    Hyundai Doosan Infracore (HDI) is aiming to mass produce internal combustion engines (ICE) the use hydrogen as fuel in 2025. The firm is unveiling its prototype ICE power unit that runs on hydrogen in 2023, with full-scale testing planned for 2024, to be followed by full-scale mass production in 2025.
  • Ferry operators sink the financing plan for Fehmarn Belt link
    December 17, 2018
    The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules. The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure. Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for tr