Skip to main content

J McCann lights up North Lincolnshire in England

Civil and electrical engineering firm McCann said it has added to its portfolio of LED lighting replacement projects with a contract in North Lincolnshire, England. McCann started the two-year contract in October 2017 but finished it around 10 months early, the company said. Installation centred on the town of Scunthorpe and the surrounding area to replace and upgrade 19,000 lanterns that include energy-saving LED technology. McCann said that the installation of these lanterns will produce a significant a
June 4, 2019 Read time: 2 mins
Civil and electrical engineering firm McCann said it has added to its portfolio of LED lighting replacement projects with a contract in North Lincolnshire, England.


McCann started the two-year contract in October 2017 but finished it around 10 months early, the company said.

Installation centred on the town of Scunthorpe and the surrounding area to replace and upgrade 19,000 lanterns that include energy-saving LED technology. McCann said that the installation of these lanterns will produce a significant annual cost-saving for the local authority and due to the early completion, savings will be greater and sooner than originally anticipated.

Work included the upgrade of earthing and isolation points to bring them in line with current regulations. There were also TR22 inspections of concrete columns to assist with risk management and to prioritise any replacement programmes.

“At a time when other authorities are switching off street lights, we're making the move to white-light LEDs because of their reduced energy consumption, saving us thousands of pounds a year and reducing our carbon footprint,” said Mike Simpson, group manager for transport asset management at North Lincolnshire Council. “We’re really pleased with the quick turnaround on this project by the McCann team, and we’re hoping to bring the next phase forward and replace an additional 4,000 lanterns across the area.”

The project comes after one of McCann’s installation and ongoing maintenance of lanterns contracts across North East Lincolnshire," noted Geoff Standley, McCann’s contracts manager.

Related Content

  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • LiuGong invests hard to be seen as made, tested and supported in Europe
    January 26, 2018
    LiuGong is investing hard in Europe, determined to be seen as a global player whose products are “made in Europe, tested in Europe and supported in Europe.” Along with new European headquarters based in Warsaw, LiuGong is also opening up a new European production line and a new continent-wide parts distribution centre at its Dressta manufacturing centre in Stalowa Wola. Geoff Hadwick reports
  • Concrete runway paving in the US
    December 15, 2017
    A new Wirtgen SP 94i slipform paver has helped deliver the successful reconstruction of a runway in the US state of Missouri. With more than 30,000 take-offs and landings a year, Jefferson City Memorial Airport (JEF) is one of the most heavily frequented airports in Missouri. Thousands of visitors travel through it every day on their way to the government and congress offices in the state capital on the Missouri River. At the end of April 2016, work commenced on the reconstruction of a runway approximately
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.