Skip to main content

Instarmac completes first manhole reinstatement in North America

UK-based Instarmac has broken into the North American market with the first use of its Manhole Installation System in Canada. Instarmac said the installation was carried out in conjunction with the Region of Peel council, near the city of Toronto. It was done quickly with minimal disruption to motorists and in temperatures above 35ºC. The Manhole Installation System has been independently tested and approved by the UK’s Highways Authority Product Approval Scheme, said Instarmac, a manufacturer and
November 7, 2017 Read time: 2 mins
Instarmac' Canadian cover story

UK-based 240 Instarmac has broken into the North American market with the first use of its Manhole Installation System in Canada.

Instarmac said the installation was carried out in conjunction with the Region of Peel council, near the city of Toronto. It was done quickly with minimal disruption to motorists and in temperatures above 35ºC.

The Manhole Installation System has been independently tested and approved by the UK’s Highways Authority Product Approval Scheme, said Instarmac, a manufacturer and distributor of cement- and bitumen-based products globally.

The Region of Peel confirmed that it will be working with Instarmac’s Canadian partner Da-Lee using the Envirobed HA104 high-performance bedding mortar on a number of other problematic manhole covers throughout the area.

Instarmac’s Manhole Installation System is made up of Envirobed HA104 high-performance bedding mortar, M60 rapid-strength bedding mortar, PY4 polyester resin system, QC10 F rapid-set flowable concrete, Instant Road Repair cold-lay asphalt, SCJ seal and tack coat spray and Instaband ECO thermoplastic overbanding tape.

The company said that manhole cover ironwork reinstated with Instarmac’s system can be opened to traffic in as little as one hour after completion. It has a service life of more than five years.

For more information on companies in this article

Related Content

  • Major Pisa link gets upgrade
    February 29, 2012
    Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section. The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Sustainable road rehabilitation
    April 20, 2021
    Huesker says that its proven technology can help reduce construction time and provide a longer service life for road surfaces. The system can also help reduce traffic congestion and CO2 emissions during road works, while being versatile and easy to install.