Skip to main content

Indra’s Horus added to more tunnels on Bogotá-Villavicencio route

Spainish IT firm Indra has implemented its Horus management system for the Herradura, Moscosio, Culebra and Oro Perdido tunnels in Colombia. The new tunnels, between Cáqueza and Puente Quetame, are part of the Bogotá-Villavicencio highway, one of Colombia's busiest roads. Indra's platform now manages 15 tunnels on the highway. This new section of the highway was opened in November 2017. The four new tunnels will be controlled by the Horus traffic and tunnel management platform, an Indra proprietary produ
January 7, 2019 Read time: 2 mins
Fanning out: Indra’s Horus technology now manages the Herradura, Moscosio, Culebra and Oro Perdido tunnels in Colombia
Spainish IT firm Indra has implemented its Horus management system for the Herradura, Moscosio, Culebra and Oro Perdido tunnels in Colombia.


The new tunnels, between Cáqueza and Puente Quetame, are part of the Bogotá-Villavicencio highway, one of Colombia's busiest roads. 5264 Indra's platform now manages 15 tunnels on the highway. This new section of the highway was opened in November 2017. The four new tunnels will be controlled by the Horus traffic and tunnel management platform, an Indra proprietary product that facilitates operation, automates processes, reduces the risk of incidents and streamlines management.

The Horus solution already controls the Renacer tunnel, which opened in 2016 and is the fourth longest in Latin America, and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.

Indra has been working with Coviandes - Concesionaria Vial de los Andes, a subsidiary of Corficolombiana and Grupo Aval. Indra is responsible for installing intelligent traffic, control and communication systems for 18 tunnels and 47 bridges carrying more than 10,000 vehicles a day on the Bogotá-Villavicencio highway.

Horus provides the operator with real-time information and an overview of everything what is happening in the tunnel, optimising decision-making in both every-day and emergency situations. Another of the advantages of Horus is that it can centrally manage several tunnels via a single interface – as it does with the highway's 15 tunnels.

Horus is equipped with an automatic incident detection system that integrates information from cameras and sensors installed along the entire section of the highway. It automatically alerts the control centre, also supplied by Indra, in the event of an incident or emergency situation.

Video surveillance, fire detection and meteorological equipment enable decisions to be made quickly and effectively. Air quality measurement systems and CO2 sensors are also in place to detect high levels of toxic gases in real time and automatically activate the ventilation systems to expel this pollution.

Variable message sign systems are also in place to provide drivers with real-time information about conditions on the highway such as safety distance between vehicles, speed limits and incidents.

Meanwhile, in the UK, roads agency Highways England has awarded Indra a contract to install the Horus system in all 13 tunnels it manages under a deal worth US$11.6 million.

For more information on companies in this article

Related Content

  • IBI’s Routemapper charts new territory with Highways England
    September 14, 2016
    Mapping the asset High-speed data collection just got faster for England’s newly created strategic roads operator Highways England’s establishment as a publicly held company in 2015 created a need for a highly accurate asset inventory. This was potentially very costly and had serious safety implications. As well as its relationships with numerous managing agents and contractors, assets include 35,300km of highway, 12,100km of earthworks, 23,200km of safety fences, 150,000 technology assets and sig
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
  • New York tunnels upgrade complete
    June 9, 2022
    Upgrade work is complete for New York’s key tunnel links.
  • Klimator to monitor Swedish road conditions
    September 14, 2022
    The project will use Klimator's detection technology called AHEAD which will combine with friction information from floating car data – FCD - to improve the understanding and interpretation of FCD on multiple lanes during winter.