Skip to main content

Indra’s Horus added to more tunnels on Bogotá-Villavicencio route

Spainish IT firm Indra has implemented its Horus management system for the Herradura, Moscosio, Culebra and Oro Perdido tunnels in Colombia. The new tunnels, between Cáqueza and Puente Quetame, are part of the Bogotá-Villavicencio highway, one of Colombia's busiest roads. Indra's platform now manages 15 tunnels on the highway. This new section of the highway was opened in November 2017. The four new tunnels will be controlled by the Horus traffic and tunnel management platform, an Indra proprietary produ
January 7, 2019 Read time: 2 mins
Fanning out: Indra’s Horus technology now manages the Herradura, Moscosio, Culebra and Oro Perdido tunnels in Colombia
Spainish IT firm Indra has implemented its Horus management system for the Herradura, Moscosio, Culebra and Oro Perdido tunnels in Colombia.


The new tunnels, between Cáqueza and Puente Quetame, are part of the Bogotá-Villavicencio highway, one of Colombia's busiest roads. 5264 Indra's platform now manages 15 tunnels on the highway. This new section of the highway was opened in November 2017. The four new tunnels will be controlled by the Horus traffic and tunnel management platform, an Indra proprietary product that facilitates operation, automates processes, reduces the risk of incidents and streamlines management.

The Horus solution already controls the Renacer tunnel, which opened in 2016 and is the fourth longest in Latin America, and 10 other tunnels opened in 2015 between Puente Quetame and Naranjal.

Indra has been working with Coviandes - Concesionaria Vial de los Andes, a subsidiary of Corficolombiana and Grupo Aval. Indra is responsible for installing intelligent traffic, control and communication systems for 18 tunnels and 47 bridges carrying more than 10,000 vehicles a day on the Bogotá-Villavicencio highway.

Horus provides the operator with real-time information and an overview of everything what is happening in the tunnel, optimising decision-making in both every-day and emergency situations. Another of the advantages of Horus is that it can centrally manage several tunnels via a single interface – as it does with the highway's 15 tunnels.

Horus is equipped with an automatic incident detection system that integrates information from cameras and sensors installed along the entire section of the highway. It automatically alerts the control centre, also supplied by Indra, in the event of an incident or emergency situation.

Video surveillance, fire detection and meteorological equipment enable decisions to be made quickly and effectively. Air quality measurement systems and CO2 sensors are also in place to detect high levels of toxic gases in real time and automatically activate the ventilation systems to expel this pollution.

Variable message sign systems are also in place to provide drivers with real-time information about conditions on the highway such as safety distance between vehicles, speed limits and incidents.

Meanwhile, in the UK, roads agency Highways England has awarded Indra a contract to install the Horus system in all 13 tunnels it manages under a deal worth US$11.6 million.

For more information on companies in this article

Related Content

  • India’s major tunnel project well underway
    December 1, 2015
    The tunnelling portion of India’s Chenani-Nashri tunnel project has now been completed. This 9.2km tunnel is of major importance for India as it will improve the transport connection between the Kashmir Valley and Jammu, reducing the distance by 30km. The tunnel is expected to open for traffic in May 2016 and will feature modern safety systems, setting a precedent for India. Advanced technology will be installed to handle ventilation, communications and traffic management, as well as safety systems such as
  • Switzerland’s new tunnel bore being built
    April 19, 2018
    A major new road tunnel project is being constructed in Switzerland – Mike Woof writes Construction work is now underway in Switzerland for the new Belchen Tunnel bore, a project that has resulted from the country’s long-term infrastructure planning. The building of this latest tunnel is important for Switzerland economically as it will deliver an upgraded link for a major transport infrastructure connection. When it is complete, the tunnel will form part of the vital A2 route between Basel, in the north
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • Colombia’s key 4G road projects underway
    January 5, 2018
    Colombia is moving ahead with its 4G programme, as nine of the 30 key projects in the road development scheme now financially secured. The remaining 21 projects are now being built, while 25 of the projects from the 1G, 2G and 3G schemes are already in use, having expanded Colombia’s network by a total of 3,743km. Colombia's National Infrastructure Agency (ANI) says that 10 projects are being carried out entirely with private funding. In addition, over the last seven years, 48km of tunnels and 430 bridges