Skip to main content

Highways England reappoints Mott MacDonald to Change Advisory Board

Mott MacDonald will continue to manage Highways England’s Change Advisory Board and its websites for technical specifications four years after the initial appointment. The contract is due to finish in 2020, with the potential to extend service provision for two six-month increments at the end of the first year. Mott MacDonald said that the board is the essential forum which safeguards the technical development of Highways Agency Traffic Management Systems. Highways England relies on it to control its day-t
September 28, 2018 Read time: 2 mins
2579 Mott MacDonald will continue to manage 8100 Highways England’s Change Advisory Board and its websites for technical specifications four years after the initial appointment.


The contract is due to finish in 2020, with the potential to extend service provision for two six-month increments at the end of the first year. Mott MacDonald said that the board is the essential forum which safeguards the technical development of Highways Agency Traffic Management Systems. Highways England relies on it to control its day-to-day traffic operations. The board manages all the technical specifications used by Highways England’s IT directorate, contractors and consultants on the National Motorway Communications System (NMCS2). It also maintains the agency’s technology software systems, plans registry, NMCS2 and Configuration Management System websites.

The board also delivers additional requirements aligned to the rollout of CHARM and Tools for the Technology Operations Centre.

CHARM - Common Highways Agency Rijkswaterstaat Model – is a collaboration between Highways England (formerly Highways Agency) and the Dutch agency Rijkswaterstaat. It was started in mid-2015 to develop an integrated advanced traffic management system for the UK and Dutch highways.

CHARM aims to move towards an open, modular automated traffic management system architecture that is integrated, flexible and scalable. It will replace legacy IT systems at the Regional Control Centre, National Traffic Operations Centre and various tunnel operations centres.  

Tools for the Technology Operations Centre, to which Mott MacDonald with key partner Fujitsu was appointed in 2018, will develop and deliver a suite of software systems that will monitor and manage electronic assets across Highways England’s network.

For more information on companies in this article

Related Content

  • Florida gets one.network closure
    November 14, 2022
    Road crews in the US state of Florida can now post lane closure information to GPS providers from their mobile phones while working on site
  • Fugro to use its ARAN system in Dutch surveying deal
    May 9, 2019
    Fugro, a geo-data specialist, is using the latest version of its Automatic Road Analyser (ARAN) in a new five-year pavement survey contract for Dutch highways. The contract, with an option to extend to 10 years, was awarded by the Dutch infrastructure agency Rijkswaterstaat. It includes the collection of surface condition and road measurement data from 8,600km of principal highways each year. The company’s Automatic Road Analyser - ARAN - which is adapted to meet European specifications and includes i
  • Highways Agency appoints firms to consider A27 bypass options
    December 15, 2014
    The Highways Agency in the UK has appointed a joint venture between Mott MacDonald and Grontmij to analyse various options for upgrades to the A27 Chichester Bypass. The aim of this project is to improve traffic flow and relieve congestion. The bypass is a 5km dual carriageway with five roundabouts and one signal control junction. It provides a key east-west transport link along the south coast of England. This connects Brighton, Worthing, Chichester, Portsmouth, Southampton. It currently suffers from heavy
  • Highways England: new agency with long-term investment strategies
    August 18, 2015
    Highways England, created out of the old Highways Agency, was set up on April 1 to oversee a closer relationship between government client and private contractors. World Highways went to a recent forum in London to hear both sides declare their hopes and challenges. Government reforms are often met with a certain amount of scepticism thanks to years of disillusionment over forgotten ministerial promises. Given that, highway contractors in the UK could have been forgiven if they had raised their eyes skyward