Skip to main content

Highway Care in SMA deal

Highway Care, in the UK, has agreed an exclusive deal to supply SMA Road Safety’s Ermes End Terminals and the Leonidas family of crash cushions.
November 2, 2020 Read time: 1 min
SMA Road Safety’s Ermes End Terminals (photo courtesy Highway Care and SMA)

Highway Care was the first to introduce a P4 End Terminal and Crash Cushion to the UK market in the early 2000’s since when around 50,000 units have been installed, according to the company.

For the SMA deal, Highway Care will supply a full range of high-speed solutions, including end terminals, in six variants of installation and performance speed. It will also supply crash cushions in 43 variants of width and performance speed.

SMA Road Safety, founded in 2011 has developed more than 30 vehicle restraint systems, specifically crash cushions and end terminals. Since 2016 it been developing monitoring systems and SMART solutions for managing, installing and repairing the SMA products.

Highway Care are a highway and security turnkey solutions provider, established in 1974. In the early 2000s, Highway Care developed the BG800 portable steel barrier.

For more information on companies in this article

Related Content

  • Inner Mongolia duty for the Tertu T40
    November 11, 2020
    French barrier manufacturer Tertu reports that progress continues on the installation of hundreds of kilometres of its T40 guardrail along China’s Inner Mongolia Highway G302.
  • Asphalt paving innovations are coming
    July 28, 2023
    Innovative new machines are coming to market that will boost efficiency for the asphalt paving segment
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Amey: “First” UK carbon-neutral resurfacing
    February 15, 2021
    Amey Consulting said the recycled road surface has greater porosity than hot-rolled asphalt.