Skip to main content

The high-life for Atlas Copco’s HiLight B5+ light tower

Developing smarter lighting solutions is part of Atlas Copco’s strategy for its new Power and Flow division, presented at a recent corporate event in London. Power and Flow was set up only in January this year as part of a major corporate revamp late last year. The leadership team of the Power Technique business area explained the strategic vision outlining how digitalisation and the construction of smart cities will be powered by cleaner and more connected energy technologies. Advances in air, power and
May 21, 2018 Read time: 2 mins
Developing smarter lighting solutions is part of Atlas Copco’s strategy for its new Power and Flow division, presented at a recent corporate event in London.

Power and Flow was set up only in January this year as part of a major corporate revamp late last year. The leadership team of the Power Technique business area explained the strategic vision outlining how digitalisation and the construction of smart cities will be powered by cleaner and more connected energy technologies.

Advances in air, power and flow technologies, such as portable compressed air machinery, electrical generators, dewatering pumps and light towers will cut carbon emissions and reduce noise.

“Our core competency is providing power solutions to thousands of sites all over the world,” said Andrew Walker, president of the 161 Atlas Copco Power Technique business area. “We are now focused purely on three pillars - air, power and flow and will continue to accelerate our research and new product development in these areas.”

Atlas Copco’s new ultra-quiet, diesel-driven, LED light tower has been specifically designed for use in urban areas. With operating noise levels as low as 55dBA, the renewed version of the HiLight B5+ light tower is ideal for events, temporary public lighting or enhanced visibility at construction sites near residential areas. The light tower’s LED floodlights can cover 5000m² at an average luminosity of 20 luxes. New safety and efficiency enhancements for light towers were also introduced.

The HiLight B5+ - and future Atlas Copco light towers - will be able to be equipped with the SmartMast. In-built sensors detect adverse environmental conditions, such as high winds, and automatically lower the vertical mast when safety or stability is compromised. It is also programmed to alert end users to potential obstacles and impacts. It also provides stability assistance when installing the light tower by flagging up irregular surfaces and floors to ensure safe siting.

For more information on companies in this article

Related Content

  • New visual identity for Atlas Copco’s Dynapac road construction equipment
    April 19, 2013
    Atlas Copco Road Construction Equipment has decided to align the visual identity of its Dynapac range of rollers and pavers to the design used by the other divisions in the Atlas Copco Construction Technique business area. Launched at bauma, the new Atlas Copco logotype is clearly visible on the products together with the Dynapac name. The colour scheme changes to yellow and grey, which is already used for construction tools, portable compressors and generators.
  • A roundabouts way of lighting
    October 10, 2022
    One of Europe’s first smart lighting systems specifically for roudabouts is operating in Hungary and making big energy savings for local government, explains Miklós Muranyi*
  • Doosan Portable Power wins €2m Saudi Arabia compressor order
    April 26, 2018
    Doosan Portable Power (DPP) has won an order worth almost €2 million for portable compressors in Saudi Arabia. The compressors have been purchased by Jeddah-based rental business, EJAR, through TAMGO, the authorised dealer for Doosan compressors, lighting towers and construction tools in Saudi Arabia. The order is for 50 Doosan 9/235HA portable compressors each providing 23.4m³/min of compressed air at a rated operating pressure of 8.6bar.
  • Xylem pumps
    December 14, 2017
    Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works. “The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rock