Skip to main content

Fleet management system boosts efficiency

Efficient machine performance and utilisation optimisation can be achieved using the new BOMAG TELEMATIC fleet management system, according to the firm. The package can be used in a mixed fleet with equipment from other manufacturers, in addition to BOMAG machines. The firm claims that this system offers new opportunities for contractors and rental firms to control, monitor and schedule service work for their machine fleets.
February 28, 2012 Read time: 3 mins
Accurate milling machine performance tracking can be achieved with the new BOMAG system
Efficient machine performance and utilisation optimisation can be achieved using the new 172 Bomag TELEMATIC fleet management system, according to the firm.
The package can be used in a mixed fleet with equipment from other manufacturers, in addition to BOMAG machines. The firm claims that this system offers new opportunities for contractors and rental firms to control, monitor and schedule service work for their machine fleets.
The system makes it possible for operators to check machine location and operating data through theInternet. Operators can also best plan the use of machines and optimise capacity and one milling contractor in the Netherlands, 3333 Aduco, has equipped its fleet of 22 planers by different manufacturers with the BOMAG TELEMATIC package.
ADUCO is one of the largest planing contractors in the Netherlands and had been looking out for a system for maintenance scheduling for some time. The company was keen to track how many hours the machines have clocked up and monitor location, as it was spending too much time planning service schedules with work often being carried out too early or too late. The firm says that the package has solved this problem and the workshop manager can see the location and data of all of its mills at any time from its office in Ede, regardless of the make.
The service intervals for all of the machines are saved in the system, so there is no need to call up each one individually. The workshop manager can see which machine in the fleet is due for a service next. The machines even send an email automatically once they have reached the servicing deadline, allowing ADUCO to plan workshop capacities more effectively.
This system not only plans servicing, but also documents it and all service work is recorded, with the printout providing a clear and comprehensive overview of costs. In addition to fuel consumption, BOMAG TELEMATIC delivers important information on operating hours for the planing drums, giving transparency on cutter wear. This has allowed the firm to gather precise information about the real costs of different machines, drums and tools.
The system provides ADUCO with comprehensive information about downtime and allows the firm to optimise the processes involved. Where long standstill periods are identified, the firm can investigate the cause more closely and see if there is a problem with truck scheduling or with the machine for example. In addition, the package allows the contractor to invoice services promptly.
After testing the system on several machines, ADUCO later fitted the package to its entire fleet of 22 units. As the firm also works in neighbouring countries, the system also helps with fleet management when units are being operated outside of the Netherlands.

For more information on companies in this article

Related Content

  • Airport expansion for the Maldives assisted by Trimble
    September 6, 2019
    An airport redevelopment and expansion project in the Maldives has been assisted by the use of technology from Trimble. In 2016 the Chinese firm Beijing Urban Construction Group (BUCG) was awarded the contract for the expansion of the Ibrahim Nasir International Airport on Hulhule island in the Maldives, which is part of the Indian Ocean island group. The massive US$440 million expansion and land reclamation work is intended to boost capacity at the Maldives Airport. BUCG has utilised Trimble field solu
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • Navman Wireless wins award
    April 30, 2012
    Navman Wireless’ Qtanium 300 GPS construction fleet tracking system has won a 2011 Chicago Innovation Award set up to recognise the most innovative new products and services introduced by Chicago-area companies. The Qtanium 300 is claimed to be the first universal construction fleet tracking system, making it possible to monitor actual equipment usage and associated costs for all makes and models of construction equipment from a single application. As part of the company's flagship OnlineAVL2 fleet tracking
  • Accurate road scanning with WDM
    January 24, 2022
    UK firm WDM has developed an innovative road assessment vehicle (RAV), capable of carrying out accurate surveys quickly. The RAV is equipped with an array of sensors that allow it to measure the various parameters needed to meet the UK SCANNER specification.