Skip to main content

Fewer cables for Siemens ST950 Plus+ traffic controller

The latest controller and signals system from Siemens, the ST950 Plus+, uses fewer cables and a smaller controller cabinet than other systems. The aim of the Plus+ solution is to offer significant reductions in on-street installation and maintenance time, improved safety and reduce deployment costs compared to conventional methods. In short, it’s easier and faster to install and later maintain, explained Keith Manston, head of product management for Siemens.
November 8, 2017 Read time: 2 mins
The latest controller and signals system from 1134 Siemens, the ST950 Plus+, uses fewer cables and a smaller controller cabinet than other systems.


The aim of the Plus+ solution is to offer significant reductions in on-street installation and maintenance time, improved safety and reduce deployment costs compared to conventional methods.

In short, it’s easier and faster to install and later maintain, explained Keith Manston, head of product management for Siemens.

Signals can be pre-assembled and the system uses low-level access poles, meaning installation engineers spend less time working on-street and so reduce risk to themselves and public disruption.

The new ST950 Plus+ system no longer uses many individual connections between signal heads and controllers. Instead it uses simple four core cables and intelligent communications to reduce the installation effort.Plus+ uses dedicated failsafe controllers, signal heads and pedestrian indicators. It also incorporates new smart-loop modules ensuring the system is tolerant of individual component and cable damage. The result is higher intersection availability and reduced disruption to the travelling public.

For more information on companies in this article

Related Content

  • AGD upgrades its 318 Traffic Control Radar WiFi AGD Touch-setup
    January 9, 2019
    AGD Systems, a UK manufacturers of ITS products, has announced two major enhancements to its 318 Traffic Control Radar. The 318 can now detect stationary or queuing traffic. This, together with the addition of WiFi AGD Touch-setup technology and an enhanced user setup GUI, will facilitate MOVA installations and other strategic applications. As more local authorities aim to eradicate in-ground detection from their road networks, thereby cutting the costs of installation, repair and ongoing maintenance, the
  • Innovations in aggregates production will boost quarry efficiency
    March 16, 2016
    New innovations are underway that will help optimise rock crushing and screening operations and boost quarry efficiency overall - Mike Woof writes. Quarrying is a tough industry that provides enormous challenges to equipment providers as machines and technology have to be rugged, durable and productive. Cutting the cost of production while optimising output has been a major target for suppliers, with new technologies playing an increasingly important role. Taking the long view with regard to increased qu
  • EastLink tollway a winner at the 9th ITS Australia National Awards
    June 4, 2019
    The Freeway Tunnel Ventilation On-Demand System for Melbourne’s EastLink project picked up the top Industry Award category at the recent 9th ITS Australia National Awards Traditional tunnel ventilation systems are inefficient. Fans operate at fixed speed in manual mode or with individual fans programmed to switch on and off at preset times to ensure zero portal emissions with all emissions dispersed via ventilation stacks. EastLink’s new ventilation on demand – VoD - system matches variable speed fan
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap