Skip to main content

Electric vehicle charging

The New Zealand government is to sink around US$7.8 million into a five-year project exploring the feasibility of in-road wireless recharging pads for electric vehicles
December 14, 2017 Read time: 2 mins
The New Zealand government is to sink around US$7.8 million into a five-year project exploring the feasibility of in-road wireless recharging pads for electric vehicles


The project is being developed by University of Auckland professors John Boys and Grant Covic, according to a report by the New Zealand Herald newspaper.

The aim is to have 64,000 electric vehicles on roads by 2021, including one-third of government vehicles. Potential buyers of electric vehicles are concerned about distances before having to recharge. The project’s inductive power transfer technology transfers power without cables, using instead the magnetic field between two close points - the same technology that is used in around 70% of the world's LCD screens.

Charging pads of soft composites are buried in asphalt at intersections or on slopes to support power transfer for vehicles travelling uphill.

"Technically, we can do that, but…can we do it cost-effectively, without actually degrading the performance of the road and ensure that the systems we put in the road can survive there for 10 to 30 years?" Covic reportedly said. "That means we have to re-engineer and come up with new science around materials that can survive being in the road."

However, he noted that objects placed in a road often damage the surface.

"All of the different means by which we build roads, these will have an impact on the nature of the design,” he said.

The newspaper said that their project was one of 68 to win a share of the $177 million of funding through the ministry of business, innovation and employment's Endeavour Fund.

Related Content

  • Electric vehicle market to grow in Europe
    February 29, 2012
    A report by Frost & Sullivan predicts that the European electric vehicle charging infrastructure market is set to boom.
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Construction trends in North America, looking to the future
    June 10, 2019
    Exciting changes in construction will reward the aware contractor - *Jeff Winke comments Hop in a car and drive anywhere in the US and chances are the drive will be on roads and highways that need patching, resurfacing, or widening, and bridges often show signs of needed maintenance. Sadly, things are in bad shape. On the last two report cards from the American Society of Civil Engineers, the US infrastructure scored a D+. This year’s report urges the government and private sector to increase spending