Skip to main content

Ecolighting lights the way with Medusa LED streetlighting

Ecolighting says that its latest LED street luminaire, Medusa, is weatherproof to IP65 and comes with an adjustable pole mounting. The Medusa is designed with a Philips advanced Xitanium driver, Samsung or Cree LEDs and an NEMA five-pin plug which comes as standard for telematics such as TELENSA or similar open protocols. Ecolighting says that the Medusa is ideal for use in streets, security, car parks and building exteriors. Importantly, it enables big cost savings and makes a substantial difference
May 8, 2019 Read time: 2 mins
Before

Ecolighting says that its latest LED street luminaire, Medusa, is weatherproof to IP65 and comes with an adjustable pole mounting.

The Medusa is designed with a 2368 Philips advanced Xitanium driver, Samsung or Cree LEDs and an NEMA five-pin plug which comes as standard for telematics such as 2619 TELENSA or similar open protocols.

Ecolighting says that the Medusa is ideal for use in streets, security, car parks and building exteriors. Importantly, it enables big cost savings and makes a substantial difference to energy bills, according to the company.
    
By using top quality LEDs in Medusa, Ecolighting ensures high thermal conductivity, minimal light decay, pure light, very stable performance and a 50,000-hour lifespan. As a result, Ecolighting offers a 10-year conditional guarantee with optional photocell control and a pre-programmed dimming cycle for smaller projects.

The Medusa comes in three body sizes and 10 different LED power outputs from 14-250W. The system uses LEDs producing 115 lumens per watt and a colour temperature of 5000K, top quality modular drivers and has surge protection to 10KV.
 
The company says that the Medusa has no radiation or emitting heat and is free from mercury, lead and other harmful substances. Its head can be adjusted from 0-90°, the optical design suits different roads, and it has a 70:30° road to pavement ratio. Its thermal management design has an effective low LED junction temperature which ensures the lifespan of the light source and its power supply.
 
For ease of installation, the streetlight has a built in spirit level and there are different power supply solutions available whether dimming or not dimming. The body comes with an advanced clip for tool-less operation and an easy to maintain fixed brace.
 
Ecolighting says that an installation of Medusa streetlight in Manchester reduced energy consumption by more than 60% on the previous lighting system.

Ecolighting
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.ecolightinguk.com false https://ecolightinguk.com/ false false%>

For more information on companies in this article

Related Content

  • Caterpillar is offering a new compact paver in the shape of the AP255E
    March 21, 2012
    Caterpillar Paving’s new AP255E is the smallest paver in the range. With a single operator, the compact AP255E meets all requirements for small and medium sized jobsites in urban centres such as pathways, cycle paths, playgrounds, trench back filling and all maintenance and repair work. The paver is designed to operate in limited spaces, due to its compact design and exceptional manoeuvrability. The AP255E is powered by a Cat C2.2 engine delivering 34kW, weighs 4.5tonnes and has a standard paving width of 1
  • Doosan’s powerful new compressor suits duties in extraction markets
    January 31, 2013
    Doosan Portable Power is offering its new large 25/280 portable compressor, which meets Stage IIIB/Tier 4 Interim emission regulations. The 25/280 portable compressor has a free air delivery of 28.3m³/min at a rated operating pressure of 25.1bar. Dual pressure regulation is a standard feature of the 25/280 compressor, allowing it to supply compressed air at operating pressures of both 25.1 or 17.2 bar. Dual pressure regulation expands the scope of applications for the 25/280 compressor which includes poweri
  • Environmentally sustainable crushing and breaking
    January 6, 2017
    Sandvik Mining and Construction has launched a new breaker and mobile crushing plant at INTERMAT. The stand also emphasizes the company’s commitment to manufacturing and supporting both products and customers in an environmentally sustainable manner. The BR1533 hydraulic breaker weighs 870kg and is suitable for carriers in the 10 to 20tonne range. With an impact rate of 550 to 1050 blows per minute, the BR1533 features Sandvik’s Fixed Blow Energy system that ensures optimum impact energy with every blow, re
  • Environmentally sustainable crushing and breaking
    April 20, 2012
    Sandvik Mining and Construction has launched a new breaker and mobile crushing plant at INTERMAT. The stand also emphasizes the company’s commitment to manufacturing and supporting both products and customers in an environmentally sustainable manner. The BR1533 hydraulic breaker weighs 870kg and is suitable for carriers in the 10 to 20tonne range. With an impact rate of 550 to 1050 blows per minute, the BR1533 features Sandvik’s Fixed Blow Energy system that ensures optimum impact energy with every blow, re