Skip to main content

Ecolighting lights the way with Medusa LED streetlighting

Ecolighting says that its latest LED street luminaire, Medusa, is weatherproof to IP65 and comes with an adjustable pole mounting. The Medusa is designed with a Philips advanced Xitanium driver, Samsung or Cree LEDs and an NEMA five-pin plug which comes as standard for telematics such as TELENSA or similar open protocols. Ecolighting says that the Medusa is ideal for use in streets, security, car parks and building exteriors. Importantly, it enables big cost savings and makes a substantial difference
May 8, 2019 Read time: 2 mins
Before

Ecolighting says that its latest LED street luminaire, Medusa, is weatherproof to IP65 and comes with an adjustable pole mounting.

The Medusa is designed with a 2368 Philips advanced Xitanium driver, Samsung or Cree LEDs and an NEMA five-pin plug which comes as standard for telematics such as 2619 TELENSA or similar open protocols.

Ecolighting says that the Medusa is ideal for use in streets, security, car parks and building exteriors. Importantly, it enables big cost savings and makes a substantial difference to energy bills, according to the company.
    
By using top quality LEDs in Medusa, Ecolighting ensures high thermal conductivity, minimal light decay, pure light, very stable performance and a 50,000-hour lifespan. As a result, Ecolighting offers a 10-year conditional guarantee with optional photocell control and a pre-programmed dimming cycle for smaller projects.

The Medusa comes in three body sizes and 10 different LED power outputs from 14-250W. The system uses LEDs producing 115 lumens per watt and a colour temperature of 5000K, top quality modular drivers and has surge protection to 10KV.
 
The company says that the Medusa has no radiation or emitting heat and is free from mercury, lead and other harmful substances. Its head can be adjusted from 0-90°, the optical design suits different roads, and it has a 70:30° road to pavement ratio. Its thermal management design has an effective low LED junction temperature which ensures the lifespan of the light source and its power supply.
 
For ease of installation, the streetlight has a built in spirit level and there are different power supply solutions available whether dimming or not dimming. The body comes with an advanced clip for tool-less operation and an easy to maintain fixed brace.
 
Ecolighting says that an installation of Medusa streetlight in Manchester reduced energy consumption by more than 60% on the previous lighting system.

Ecolighting
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.ecolightinguk.com false https://ecolightinguk.com/ false false%>

For more information on companies in this article

Related Content

  • Alpha 330 drilling tool system from Sandvik
    January 6, 2017
    Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
  • Alpha 330 drilling tool system from Sandvik
    February 13, 2013
    Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
  • Sandvik is now using Volvo Penta engines in its underground trucks and loaders
    January 6, 2017
    Sandvik Mining is now using Volvo Penta engines in its underground trucks and loaders. The advanced engines meet Tier 4 Interim/Stage IIIB emission standards and are claimed to reduce fuel and ventilation costs in comparison with other units. The Volvo Penta engineers designed a selective catalytic reduction (SCR) unit in the exhaust system that converts NOx gas into nitrogen and water. The Volvo Penta exhaust-treatment solution also reduces DPM levels without the need for a diesel particulate filter (DPF).
  • Sandvik is now using Volvo Penta engines in its underground trucks and loaders
    January 30, 2013
    Sandvik Mining is now using Volvo Penta engines in its underground trucks and loaders. The advanced engines meet Tier 4 Interim/Stage IIIB emission standards and are claimed to reduce fuel and ventilation costs in comparison with other units. The Volvo Penta engineers designed a selective catalytic reduction (SCR) unit in the exhaust system that converts NOx gas into nitrogen and water. The Volvo Penta exhaust-treatment solution also reduces DPM levels without the need for a diesel particulate filter (DPF).