Skip to main content

Clearview magnetometer trial detects alternative to loops

An UK investigation into the performance of Clearview Intelligence’s magnetometers as an alternative to inductive loops on MIDAS installations has concluded they deliver like-for-like results.
October 1, 2019 Read time: 3 mins
Study clears the way for Clearview’s M100 magnetometers

The study also showed that there are additional benefits, according to 8900 Clearview.

MIDAS - motorway incident detection and automatic signalling, is a network of traffic sensors, usually inductive loops that alert a local control centres to traffic flow and average speeds. The data helps the centre set information for travellers, such as variable message signs and advisory speed limits.

The trial was done by a project group comprising representatives of Clearview Intelligence, 8100 Highways England (the government roads agency), 2316 A-one+ (a UK joint venture  equally owned by 1662 Jacobs Engineering Group and construction companies 184 Colas and 2319 Costain), Connect Roads (a UK road operator) and Mway Comms (a UK highways technology provider). The joint venture undertook a year-long trial on the A1/M1 motorway comparing the performance of magnetometers and loops when monitoring speed, traffic flow and classification of vehicles.

“The conclusion of the report is that under similar circumstances and with the same installation methodology, the magnetometers are a suitable alternative to inductive loop detection,” according to a statement by Jacobs Engineering Group which compiled the findings report on behalf of A-one+.

Clearview noted that Connect Roads had previously been managing a lane surfacing strategy that created additional re-cutting of loops and subsequent increased degradation of the road surface. Highways England was also struggling to build a viable business case for full radar deployment. As a result, they agreed to a commission of Clearview’s M100 magnetometers on a trial basis.

Unlike inductive loops which are installed across the width of the carriageway, the M100 is cored into the centre of the lane. This avoids the natural wearing course. Sensors detect changes in the earth’s magnetic field caused by passing vehicles to provide vehicle detection data equivalent to that generated by inductive loops.  

Following completion of the trial, the data was submitted to, and accepted by the National Information Service, which confirmed the data was “suitable for vehicle clarification”.

With a battery life of between eight and 10 years, the trial recognised the installation and replacement of magnetometers was “far less onerous” than loops when considering the time, cost and traffic management, as well as the fact the M100 is non-evasive to the road surface.  

Clearview says that it’s magnetometers are up to four times faster to install than traditional loops. Because they are battery operated, they can be installed independently of each other which reduces the need for full carriageway closures. They can also be installed to a depth of up to 165mm which allows for carriageways to be resurfaced without the need to remove and reinstall the magnetometers.

 

For more information on companies in this article

Related Content

  • Closer ties with Highways England Collaborative Delivery Framework
    April 13, 2017
    Highways England is reconsidering its procurement to encourage innovation and ultimately deliver more for less. Kristina Smith spoke to client, contractors and material suppliers to find out more. A group of senior managers is being addressed by a local resident who lives close to some proposed road works. The resident is angry, persistent and quite rude. The question is: how will these managers respond?
  • Transport for London shortlist for up to US$3bn work contracts
    April 19, 2012
    Transport for London (TfL) has shortlisted ten contractors for a road maintenance framework that could be worth as much as US$3billion over eight years. The framework is split into four contracts and could cover all London roads from 2013. TfL said the framework would provide cost savings and other efficiencies. The final contracts will be awarded before the end of 2012. The ten contractors are: Amey, Balfour Beatty Living Places, Bam Nuttall-Hyder Consulting, Colas-VolkerHighways-URS Scott Wilson, Co
  • Bio-binder and reclaimed asphalt trials for UK
    August 15, 2024
    Heidelberg Materials has used its CarbonLock asphalt containing polymer modified bitumen bio-binders, produced as both hot mix and warm mix asphalts.
  • Scottish trial for OTT HydroMet’s ecoLog 1000
    April 25, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland.