Skip to main content

APE’s 45 highway barrier cuts toll lane occupancy

Aximum Produit Èlectroniques’ (APE) development of its new 45 highway barrier stems from what the French firm says is a search for better productivity through shorter toll lane occupancy, a reduction in ownership costs and reduced risks for toll employees during maintenance operations. Of the barrier’s name Frédéric Lardeur, APE’s marketing and communications director, said, “45° is the angle made when the barrier boom moves to open the toll lane. When a barrier opens, the boom traditionally makes a 90°
April 3, 2014 Read time: 3 mins
An APE 45 highway barrier installed at a tolling station for the Tunnel Prado-Carénage near Marseille, France
164 Aximum Produit Èlectroniques’ (APE) development of its new 45 highway barrier stems from what the French firm says is a search for better productivity through shorter toll lane occupancy, a reduction in ownership costs and reduced risks for toll employees during maintenance operations.

Of the barrier’s name Frédéric Lardeur, APE’s marketing and communications director, said, “45° is the angle made when the barrier boom moves to open the toll lane. When a barrier opens, the boom traditionally makes a 90° angle with the roadway.”

Lardeur said vehicles should not stop for long in toll lanes to keep traffic flowing freely, and stressed how many mechanical and electrical components are required to ensure very short barrier opening times. However, after several million vehicles pass the barriers, their components may become damaged and give way.

“Our Research Department has benefitted from its many years of expertise in the highway sector and the thousands of barriers installed in France, throughout Europe and also Africa,” continued Lardeur. “Reducing the [45] barrier’s opening time was the first objective. To achieve the reduction, APE developed the 45° motion which clears the lanes more quickly with minimum mechanical and electrical effort.”

Robustness and reliability are two essential characteristics for equipment subjected to very high constraints. The 45 barrier’s mechanical and electrical components were submitted to drastic fatigue tests, and its barrier mechanism is said by APE to be guaranteed for over four million operations.

“The 45 barrier is much safer for users than conventional barriers,” added Lardeur. “As a matter of fact, if it is hit by a vehicle the arm moves up and aside with a natural 45° motion. Its movement is stopped by the mechanism and the toll-light fitting. There is no damage to the vehicle and for the operator no boom needs to be replaced.

“To optimise the time a toll employee stands by the barrier, the mechanical and electrical control systems are accessed through the top. All moving parts are totally protected by hoods."

Toll managers already using APE barriers have no need to worry, said Lardeur, as the firm guarantees that all elements of the 45 barrier are compatible with existing installations. Over 90% of the 45’s components are already said to exist in APE’s barrier range.

For more information on companies in this article

Related Content

  • Success of toll road operators' conference
    July 12, 2012
    The 37th ASECAP Annual Study and Information Days held in Krakow, Poland, gathered some 300 road transport CEOs, experts and government decision-makers making the event "a huge success." Patrick Smith reports Toll road operators from across Europe have met to discuss the state of their businesses in the current economic climate and how to tackle it. Fabrizio Palenzona, the outgoing President of ASECAP (the European professional Association of Operators of Toll Road Infrastructures) and president of AISCAT (
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New innovations are being developed in diesel engines and drive technologies
    April 24, 2013
    Innovative new engine emissions control technology is coming to market - Mike Woof reports. The diesel engine sector has been one of the most active and innovative areas for technological development in the past 10 years. Engine firms have invested enormous sums in developing new, low emissions technologies that reduce the quantities of nitrous oxide and particulates from the tailpipe. All the firms have taken a different approach in this regard, using various combinations of the technologies available such
  • Ammann’s steerable pedestrian roller equals versatility
    April 26, 2024

    Ammann is offering an innovation in the shape of its ARW 65-S walk-behind Roller, which features articulated steering. This make allows the user to guide the machine more accurately forward, backward, and laterally.

    The new S version has a pivoting mechanism , unlike the prior version which only enables forward and reverse movements. With the S version, the machine can also be moved to the right and left using the control handle.