Skip to main content

3i buys SRL Traffic Systems

SRL Traffic Systems, a UK and Republic of Ireland manufacturer of portable and temporary intelligent transport system (ITS) solutions, has been bought by 3i Infrastructure.
March 29, 2022 Read time: 2 mins
SRL’s solutions include variable message signs, work zone protection barriers, CCTV and portable urban traffic management and control technology

SRL, based in the English town of Middlewich, was founded in 1997 and has 170 employees and 150 specialist vehicles. It went through a management buyout in 2019 and has since  grown its product portfolio. Solutions include variable message signs, work zone protection barriers, CCTV and portable urban traffic management and control technology. It also has traffic signals featuring what the company says is the market’s only multiphase adaptive detection system.

3i is a London Stock Exchange listed investment company with longstanding experience of investing in asset companies and has acquired a 92% controlling stake in SRL. The SRL management team has re-invested to secure the remaining 8% share.

3i said the buyout “will facilitate SRL’s next phase of growth, which will include development of the firm’s research and development and manufacturing capabilities, creation of innovative new products and expansion into new markets”.

SRL’s new chief executive officer is Adrian Murphy who joined the company as chief operating officer in April. He replaces Richard Tredwin, who will take up the role of non-executive chairman, replacing Sat Dhaiwal.

Recently, SRL and SWARCO Traffic, a traffic technology specialist, formalised their partnership, with SRL becoming SWARCO Traffic’s official Strategic Hire Partner.  The partnership is an extension of the ongoing relationship between the two businesses, which has seen over 400 SWARCO signs form part of the SRL fleet for use on roads throughout the UK and Ireland.

SRL also recently announced an exclusive partnership with barrier and gate manufacturer Solar Gates UK to hire out the manufacturer’s INSTABOOM work zone barriers. SRL says the solar/hybrid instant protection barriers are a safer and more cost-efficient alternative to the traditional plastic barriers staffed by dedicated gate-people. INSTABOOM can be seen in many work zones throughout the UK, including SMART motorways and the high-speed rail HS2 project. 

For more information on companies in this article

Related Content

  • WiM eases bridge structural health worries
    March 22, 2024
    Concerns about ageing road bridges are leading road authorities to consider the case for using weigh-in-motion - WiM - solutions to monitor health of such infrastructure, writes Adam Hill.
  • New JCB World Logistics plant opens
    February 12, 2014
    JCB Chief Executive Graeme Macdonald has officially opened the company’s newest facility in Staffordshire, which has created almost 100 new jobs in just six months. JCB World Logistics took over the former 35,581m² Blue Planet warehouse in Newcastle-under-Lyme in July 2013 and since then almost 80 new warehouse and office staff and 20 drivers have been recruited. In the next two years employment levels are expected to triple to more than 300 as the facility becomes fully operational.
  • The March of the Urban Low-emission Zone
    April 17, 2018
    Europe’s political patchwork is getting a low-emission zone overlap, according to Malcolm Kent* By now, pretty much everybody in the industry will be aware of the Low Emission Zone in London, UK. But awareness of similar European zones about to start or expand might be more patchy. The background to all of these schemes is the problem of air quality, particularly European Union rules setting limits on acceptable pollution levels. It was found some years ago that several member states’ cities, including
  • Telvent to implement its SmartMobility Road Suite in Saudi Arabia.
    May 14, 2012
    Telvent GIT has been awarded a contract by Almabani General Contractors to implement the Telvent SmartMobility Road Suite solution on the extension of the roads in Arriyadh Old Airport area. The project, lead by the High Commission for the Development of Arriyadh, will extend the existing north-south and east-west highways for more than 11 kms and the construction of three tunnels.