Skip to main content

Work starts on Steveston Interchange

The Steveston project near Vancouver is part of the overall Highway 99 Tunnel Programme that will replace the aging George Massey Tunnel under the Fraser River.
By David Arminas July 11, 2022 Read time: 2 mins
The Steveston interchange near Vancouver will replace a two-lane overpass at Steveston Highway and Highway 99 with a five-lane structure (image courtesy of the government of British Columbia)

Ground was broken this month on the five-lane Steveston interchange in Richmond, near Vancouver on Canada’s west coast.

The Steveston project is part of the overall Highway 99 Tunnel Programme that will replace the aging George Massey Tunnel with a toll-free, eight-lane immersed tube structure under the Fraser River.

Work this summer on the interchange involves clearing and utility relocations for major construction to begin by the end of year. The new interchange expected to be in operation in 2025. The Steveston interchange will help move people and goods faster and safer by replacing the existing two-lane overpass at Steveston Highway and Highway 99 with a five-lane structure that accommodates two eastbound lanes and three westbound lanes, including a left-turn lane.

The new interchange will improve access to transit stops and provide safe pedestrian and cycling connections across Highway 99, with sidewalks and separated bike lanes on both sides of the overpass.

The existing tunnel was opened in 1959 as a vehicle-only crossing but it now fails to meet the region’s needs or modern seismic standards, according to the provincial British Columbia government. Highway sections at both ends of the tunnel require upgrades to improve safety and traffic flow for vehicles, transit users, pedestrians and cyclists.

Earlier this year, COWI won the contract to act as owner's engineer for the replacement tunnel. Cowi said it will draw on its experience designing the original four-lane George Massey tunnel in 1959 and whose removal the engineering firm will oversee.

To learn more about the Highway 99 tunnel project, click here.

For more information on companies in this article

Related Content

  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.
  • BC to renovate Simon Fraser Bridge
    January 20, 2022
    The Canadian province will rehabilitate the deck structure of the southbound bridge of the twin-bridge river crossing in Prince George.
  • British Columbia issues RFQ for US$2.7 billion Massey Bridge
    June 30, 2016
    Canada’s provincial British Columbia government has issued a request for qualification for construction of a US$2.7 billion bridge over the Fraser River around the city of Vancouver. The 10-lane bridge will be built under a 30-year public-private partnership agreement and will include tolled transit lanes and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day an
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.