Skip to main content

Virginia project for Parsons

Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.
June 28, 2016 Read time: 2 mins
RSS3220 Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.

Currently, the 16km stretch of I-66 is restricted during peak rush hours to vehicles with two or more occupants. These high occupancy vehicles will continue to travel the highway section for free. However single-occupant vehicles will pay a rush-hour toll based on traffic volume. All travel lanes will remain free to all motorists during off-peak periods. Toll revenue will fund new travel options that may include bus services, upgraded and expanded bike and pedestrian access, intersection upgrades on parallel roads and other transit developments.

For more information on companies in this article

Related Content

  • Adaptive signal control report
    April 30, 2012
    A study of McCain’s QuicTrac adaptive control software, deployed over a year ago by the Californian city of Temecula, has highlighted the array of benefits achievable through an adaptive system. The survey calculated the arterials’ level of service, measured in delay per vehicle, both pre- and post-deployment, evaluating the systems’ benefit-to-cost ratio and environmental impact.
  • Virginia highway contract awarded to partnership
    October 27, 2017
    The much-needed Interstate 64 widening project in the US state of Virginia is now getting the go-ahead. The project will be handled jointly by Granite Construction, Parsons and Corman. The three firms are working in a partnership to deliver the project under the design-build model. The work will help reduce congestion and improve traffic flow at peak periods. Two lanes and high occupancy toll lanes will be added to the route, increasing capacity.
  • Loan for major US tunnel project
    October 4, 2021
    A loan facility will help finance a major US tunnel project.
  • Key link upgrade for Washington State
    February 23, 2012
    The US state of Washington's Department of Transportation (WSDOT) has awarded a major contract to rebuild and upgrade State Route 520 in King County.