Skip to main content

Virginia project for Parsons

Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.
June 28, 2016 Read time: 2 mins
RSS3220 Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.

Currently, the 16km stretch of I-66 is restricted during peak rush hours to vehicles with two or more occupants. These high occupancy vehicles will continue to travel the highway section for free. However single-occupant vehicles will pay a rush-hour toll based on traffic volume. All travel lanes will remain free to all motorists during off-peak periods. Toll revenue will fund new travel options that may include bus services, upgraded and expanded bike and pedestrian access, intersection upgrades on parallel roads and other transit developments.

For more information on companies in this article

Related Content

  • Growing US congestion problems will get worse according to study
    April 30, 2012
    The economic recession has only provided a temporary respite from the growing congestion problem, according to Texas Transportation Institute 2011 Urban Mobility Report.While traffic problems have stagnated in the US along with the economy, the annual study suggests that too little progress is being made toward ensuring that the nation's transportation system will be able to keep up with job growth when the economy does return.
  • ACS to pilot ExpressPark in LA
    May 1, 2012
    Los Angeles city is teaming up with ACS to create a new pricing system that is part of a parking strategy designed to relieve traffic congestion, reduce air pollution, and improve the efficiency of downtown LA's transit operations.
  • Highway project in Texas required demolition equipment
    May 1, 2018
    A contractor in Texas has used equipment from Brokk to help out with a tricky highway project. Upgrading work has been carried out on a 6.4km-long stretch of I-35 in San Antonio between Loop 410 NE and Loop 410 S. This stretch of the route was carrying around 185,000 vehicles/day and was suffering increasing levels of congestion at peak periods. Travel times lengthened by 65% during rush hour, while ramps on opposite sides of the interstate caused additional congestion and safety issues. In one section, t
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong