Skip to main content

Vietnam plans new ring road for Hanoi

The Vietnamese Government is moving forward with its project to build ring road No 4 around Hanoi.
February 23, 2012 Read time: 1 min
The Vietnamese Government is moving forward with its project to build ring road No 4 around Hanoi. The new ring road is expected to cost up to US$3.7 billion and as this will be a major construction project, it will take until 2020 to be completed. When completed the road will be 136km long and will feature six lanes, carrying three lanes of traffic in either direction. The ring road will feature a design speed of 100km/h and is intended to reduce the chronic congestion Hanoi suffers at present, by helping divert through traffic around the city. At present 2560 Vietnam's Ministry of Transport has submitted the zoning plan detailing the land required to the country's government and this will be reviewed before any approvals can be given. The tender process can only be announced once all the necessary approvals have been awarded.

Related Content

  • Australia responds to infrastructure funding challenge
    July 13, 2012
    The Global Financial Crisis (GFC) has drastically changed the way governments and the private sector is prepared to procure vital infrastructure projects, says Philip Davies Governments have responded to the GFC by focusing on long term investment in transport infrastructure and shorter term stimulus packages to kick-start economies. As these projects proceed, the focus will shift to maintaining and achieving maximum benefits from assets and future infrastructure funding. The Public Private Partnership (PP
  • Israel link upgrade
    March 19, 2012
    Israel’s National Infrastructure Committee (INRC) has now issued its final approval for upgrades to Road No 1.
  • Two new Vietnam expressways
    February 15, 2017
    Work on two new expressways will commence in Vietnam during 2017. The projects are both being managed by the Vietnamese Government and are being constructed in the southern province of Dong Nai. A build-operate-transfer (BOT) format will be employed for the construction of a 60-kilometer-long first section A 60km expressway will run through Tan Phu and Dau Giay and join with the Dau Giay-Lien Khuong expressway, with the work being carried out under the build, operate, transfer model. This expressway
  • New safety barrier solutions protect road users
    February 21, 2012
    Novel safety barrier solutions are coming to market, writes Mike Woof The safety barrier market is a focus for innovative products designed to meet a range of different applications. The diverse range of vehicle types on the road poses numerous technical challenges to barrier manufacturers. At the same time, different applications such as motorcycle safety, end treatments, bridge barriers and roadside obstacle protection require novel solutions. Although motorcycles account for only a small proportion of ve