Skip to main content

URS to operate Missouri DOT's Gateway Guide TMC

URS has been awarded a two-year contract, with the option for a two-year extension, by the Missouri Department of Transportation (MoDOT) to provide operations and support services for the Gateway Guide Transportation Management Centre (TMC) located in St.
March 1, 2012 Read time: 1 min
URS has been awarded a two-year contract, with the option for a two-year extension, by the 2699 Missouri Department of Transportation (MoDOT) to provide operations and support services for the Gateway Guide Transportation Management Centre (TMC) located in St. Louis, Missouri. The centre monitors over 350kms interstate utilising nearly 500 sensors and 250 traffic cameras in the St. Louis Metropolitan Area. During non-business hours, Interstates 44 and 55 statewide are also monitored. Congestion and incidents along the interstate are managed through messages on 100 dynamic message signs throughout the metropolitan area. The Gateway Guide TMC also coordinates closely with the Illinois DOT District 8 TMC located in Collinsville to manage traffic on the Mississippi River Bridges.

For more information on companies in this article

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Complete control of machines using technology
    December 12, 2019
    Sophisticated machine control technology has been utilised on heavy equipment to help deliver a challenging project in New Zealand
  • Smart infrastructure asset maintenance using AI
    March 31, 2020
    Smart infrastructure asset maintenance can be achieved using AI.
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.