Skip to main content

URS to operate Missouri DOT's Gateway Guide TMC

URS has been awarded a two-year contract, with the option for a two-year extension, by the Missouri Department of Transportation (MoDOT) to provide operations and support services for the Gateway Guide Transportation Management Centre (TMC) located in St.
March 1, 2012 Read time: 1 min
URS has been awarded a two-year contract, with the option for a two-year extension, by the 2699 Missouri Department of Transportation (MoDOT) to provide operations and support services for the Gateway Guide Transportation Management Centre (TMC) located in St. Louis, Missouri. The centre monitors over 350kms interstate utilising nearly 500 sensors and 250 traffic cameras in the St. Louis Metropolitan Area. During non-business hours, Interstates 44 and 55 statewide are also monitored. Congestion and incidents along the interstate are managed through messages on 100 dynamic message signs throughout the metropolitan area. The Gateway Guide TMC also coordinates closely with the Illinois DOT District 8 TMC located in Collinsville to manage traffic on the Mississippi River Bridges.

For more information on companies in this article

Related Content

  • A new runway surface for a major airport in Indonesia
    August 12, 2020
    Major rebuilding work has been carried out at Minangkabau International Airport (PDG), while the New Yogyakarta International Airport (NYIA) has been built in Indonesia.
  • US DOTs in critical funding battle
    February 9, 2012
    In the US, state DOTs are preparing for the upcoming reauthorisation battle in a tough economic and political climate. Set to expire by the end of the year, the bill is a critical funding source for many transportation projects in the US. However transportation officials in the US are facing a tough battle as the political and economic climate has changed considerably since the last reauthorisation was passed, shortly after President Obama's inauguration in January 2009. Since then, the recession has contin
  • Bechtel and Enka complete further Kosovan motorway stretch
    July 13, 2012
    Bechtel and its joint venture partner, Enka, have completed a further 4.5km of the Kosovo motorway. The new section, which takes the total completed by Bechtel and Enka to 42.5km, opened on Friday 13 July and connects with the stretch of motorway delivered in November 2011 going from Morinë at the border with Albania to Suhareka. The growing Kosovo motorway now extends to the Dule interchange in Northern Kosovo. The latest stretch was built in less than a year, ahead of schedule and within budget.
  • Weighty matters for developing countries
    November 6, 2012
    One leading Weigh in Motion technology manufacturer is helping governments in developing countries reduce excessive road damage, while several others have seen their latest WIM systems recently used on the highways of Eastern Europe. Guy Woodford reports Recent Central Weighing WIM installations in Bangladesh are helping its national government reduce the financial burden of excessive road damage, while also protecting many bridges that are vital to transport and trade. The need for such installations was e