Skip to main content

Uprades for Glaskar and Damsgård tunnels

Norway’s Statens vegvesen will improve safety and communication systems in the Glaskar and Damsgård tunnels in Bergen.
By David Arminas July 10, 2023 Read time: 1 min

Norway’s public roads administration Statens vegvesen has awarded contracts to upgrade safety facilities in the E39 Glaskartunnelen and RV 555 Damsgårdtunnelen in Bergen.

All technical equipment inside and outside the tunnels will be replaced, ventilation systems, lighting, drainage, camera surveillance, fire extinguishing systems and telephones.

The contract for the four-lane twin-tube Glaskartunnelen tunnel has been awarded to Norwegian company Fyllingen Maskin in collaboration with Strand and Magnus Thunestvedt, at a value of €9.14 million. The 597m-long southbound tube was opened in 1990 and the northbound tube, at 585m, was opened in 1994.

Meanwhile, a €37.43 million contract for the 2.3km Damsgårdtunnelen – also four lanes and twin-tube - has been awarded to OneCO Infra. The eastbound tube was opened in 1992 with the other tube opening a year later.

For more information on companies in this article

Related Content

  • Lumitex lights up Melbourne's EastLink tunnels
    June 18, 2021
    The 1,066 high-pressure sodium lights have been exchanged for 1,174 Lumitex LEDs throughout the EastLink network's 1.6km twin tunnel complex in Melbourne, Australia.
  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane
  • The Hague’s Victory Tunnel opens
    February 22, 2021
    The Victory Boogie Woogie tunnel is part of the new 4km Rotterdamsebaan.
  • Norway’s bridges cause for concern
    November 10, 2017
    Concern is being expressed over official reports in Norway that 1,087 of Norway’s 16,971 bridges are in need of repairs. The structures in question feature damage that is considered substantial enough to affect their load capacity or safety. The reports also reveal that just eight of the country’s bridges have been inspected since 2013. Norway’s Public Road Administration (Statens Vegvesen) has the task of inspecting the country’s bridges and ensuring they meet requirements. However there are concerns over