Skip to main content

Uprades for Glaskar and Damsgård tunnels

Norway’s Statens vegvesen will improve safety and communication systems in the Glaskar and Damsgård tunnels in Bergen.
By David Arminas July 10, 2023 Read time: 1 min

Norway’s public roads administration Statens vegvesen has awarded contracts to upgrade safety facilities in the E39 Glaskartunnelen and RV 555 Damsgårdtunnelen in Bergen.

All technical equipment inside and outside the tunnels will be replaced, ventilation systems, lighting, drainage, camera surveillance, fire extinguishing systems and telephones.

The contract for the four-lane twin-tube Glaskartunnelen tunnel has been awarded to Norwegian company Fyllingen Maskin in collaboration with Strand and Magnus Thunestvedt, at a value of €9.14 million. The 597m-long southbound tube was opened in 1990 and the northbound tube, at 585m, was opened in 1994.

Meanwhile, a €37.43 million contract for the 2.3km Damsgårdtunnelen – also four lanes and twin-tube - has been awarded to OneCO Infra. The eastbound tube was opened in 1992 with the other tube opening a year later.

For more information on companies in this article

Related Content

  • Tunnel technology improves driving safety
    February 14, 2012
    Tunnel technology advances will make driving through underground links considerably safer, writes Mike Woof
  • Frost-heave a problem on Norwegian roads
    May 8, 2012
    Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • IRD wins Georgia state weigh-in-motion deal
    March 9, 2015
    International Road Dynamics (IRD) will design, supply and install 19 mainline weigh-in-motion systems throughout the US State of Georgia. IRD, based in the city of Saskatoon in the Canadian province of Saskatchewan, said the contract is worth US$7.93 million. The deal includes mainline WIM scales on the interstate, at the roadside and in scale houses as well as license plate reading, USDOT number reading, side view cameras and over-height detection systems at 19 weigh station locations. IRD’s systems will c