Skip to main content

Ukraine's latest route

Plans are in hand in the Ukraine's Crimea area for a new 93km highway.
February 27, 2012 Read time: 1 min
Plans are in hand in the Ukraine's Crimea area for a new 93km highway. This route will connect Gvardeyskoe, Gluboky Yar and Yalta and will include a 7km section of tunnel running under Mount Ai-Petri. The project is expected to cost in the region of US$1.5 billion (€1.04 billion) to construct. Building the new highway will reduce journey times by cutting the distance drivers have to travel along the route by as much as 30km.

Related Content

  • Beijing–Taipei link
    June 22, 2012
    The authorities in China have revealed that construction of the Fuzhou section of the new Beijing–Taipei highway will commence by late May 2012. The two-way four-lane expressway will have a design speed of 100km/h. The 53km Fuzhou section is expected to cost some US$1.04 billion to construct. This section of highway will take four years to complete.
  • Plans in hand for Slovakia’s longest tunnel
    June 16, 2014
    In Slovakia plans are being made for a new project that will become the country’s longest tunnel when it is complete. Salini Impregilo is the contractor heading the project. The work looks set to cost in the order of €410 million and the project is due for completion in late 2019 or early 2020. Although there was a lower priced bid for the project, this was excluded due to technical problems relating to the proposed tunnel exits. The Visnove Tunnel will measure some 7.7km long and will be constructed in the
  • Blasting starts for Fiskefjord Tunnel
    October 17, 2023
    The 9.7km Fiskefjord Tunnel will be the longest tunnel within the public-private E10/rv 85 project in northern Norway.
  • Elevated highway planned for Philippines
    February 23, 2017
    Proposals have been put forward for an innovative elevated highway stretch in the Philippines. The proposed route would run from the Delpan Bridge in the capital Manila, across the Pasig River and on to the Napindan Bridge in Taguig. The plans have been suggested by the construction firm AKH General Contractor. In addition to carrying two lanes for traffic in either direction, the 22km elevated highway would also provide a rapid transit system. Called the Integrated Viaduct and Personal Rapid Transit System