Skip to main content

UK motorway upgrade ahead of schedule

Joint venture contractor Skanska Balfour Beatty has completed work on a 19km section of the M25 motorway in the UK, six months ahead of schedule. Work on the M25 scheme between junctions 5 and 7 in Kent and Surrey forms part of a new generation of technology-driven improvements on the UK’s strategic road network.
May 1, 2014 Read time: 2 mins
M25 section 2 - operational smart motorway
Joint venture contractor 2296 Skanska 1146 Balfour Beatty has completed work on a 19km section of the M25 motorway in the UK, six months ahead of schedule. Work on the M25 scheme between junctions 5 and 7 in Kent and Surrey forms part of a new generation of technology-driven improvements on the UK’s strategic road network. These smart motorways are intended to deliver increased overall capacity, shorter journey times and reduced congestion. An overhead technology system provides drivers with optimum driving speeds to ensure that these goals are achieved. The scheme is contributing to making the busy M25 technologically advanced, with hard shoulder running and variable speed limits combining to make a permanent all-lane running smart motorway. Skanska Balfour Beatty has used Building Information Modelling (BIM) to provide real-time information to the construction teams and allow improvements to the design, reducing the need for time being spent on manual intervention. The project has utilised an electronic sign-off system which has led to a reduction in the delays incurred by previous off-line methods and also helped to save on initial project budget projections. Meanwhile over 90% of materials including fill material have come from recycled or reclaimed sources.

John Payne, 2309 Highways Agency Project Manager said, “The improvements on the M25 in Kent and Surrey are part of the £1.7 billion of investment into roads in the South East by 2021. The new smart motorway will provide extra capacity and offer more reliable journeys for the 140,000 drivers that use this stretch of road every day. I’m particularly pleased that the southern section of the M25 has opened well ahead of planned completion this winter thanks to rescheduling of the programme.”

Drivers will also benefit from the full completion of the Northern section between Junctions 23 to 27 later this year.

For more information on companies in this article

Related Content

  • New techniques for tackling congestion
    December 8, 2015
    Transport experts from the Royal Academy of Engineering are proposing methods to reduce traffic congestion. These proposals are included in a discussion document intended to stimulate debate on congestion issues. The working group behind the paper includes industry experts and academic researcher. The team looked at technology and policy measures that could reduce congestion in the most critical transport sectors by 2030, evaluating which measures would be effective and value for money.
  • Mobile grouting trailers for soil nail rigs
    February 7, 2012
    Geotechnical specialists, Bachy Soletanche and Carillion Piling are currently working on an £18 million (e21 million) geotechnical contract as part of carriageway improvements on the M1 motorway to the north of London, England. The work between junctions 10-13, Luton to Milton Keynes, is being carried out for the Costain Carillion joint venture working on behalf of the Highways Agency. The piling and soil nailing works are to facilitate the conversion of the current hard shoulder to a peak-time running lane
  • TRL wins UK contract from National Highways
    October 29, 2021
    TRL has won a UK pavement survey contract from National Highways.
  • Variable message signs emerging from the shadows
    July 8, 2016
    Variable message signs are increasingly seen on the world’s motorways. World Highways looks at some of the latest developments UK manufacturer of temporary, solar powered variable message signs, Bartco UK, has unveiled what it says is the first temporary VMS designed for use within work zones. Bartco said that its HD Quattro was developed in response to feedback from customers requiring a product to affirm on-site speed limits for work zone vehicles. The unit is designed to show limited amounts of inform