Skip to main content

Tyne Bridge revamp finally starts

The UK’s Department for Transport has handed over €41 million – promised in 2022 – for a restoration of the historically listed 95-year-old Tyne Bridge in northeast England.
By David Arminas February 12, 2024 Read time: 2 mins
The through-arch steel Tyne Bridge, whose longest span is nearly 162m, took around two and half years to build, opening in February 1928 (image © Gordon Bell/Dreamstime)

The Department for Transport (DfT) will provide €39.6 million towards the restoration of the historic 389m-long, 17m-wide bridge across the River Tyne linking Newcastle upon Tyne and Gateshead.

The highly distinctive, through-arch steel bridge, whose longest span is nearly 162m, took around two and half years to build, opening in February 1928.

Restoration will cost a total €46.5 million, with the rest coming from Newcastle and Gateshead city councils, according to a report by the BBC. Some of the money will go towards improving the A167 highway, sometimes called the Newcastle Central Motorway. Repairs to the historic bridge commenced in the third quarter of 2023 but it was not until the DfT funding package was secured that the complete improvement programme could commence fully.

The department noted that the last major repair work was completed in 2001, while the A167 had not received upgrades since opening in 1975.

About 70,000 vehicles use the bridge daily. Initial work began in September last year with work estimated to take four years. Restoration will include repainting the complete steel elements .The local governments from Newcastle and Gateshead also contracted work for critical structural repairs, including steel and concrete fixes, bridge joint replacements, drainage improvements, waterproofing and resurfacing and parapet protection.

Newcastle upon Tyne, or simply Newcastle, is on the River Tyne's north bank, opposite Gateshead to the south and is the most populous settlement in the Tyneside conurbation and north-east England. The historic bridge structure formerly carried the important A1 Great North Road through the centre of Newcastle but the route was diverted in the 1970s to reduce congestion in the city.

Related Content

  • SWARCO completes installation on UK’s busiest north east highways
    March 22, 2017
    SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards. Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the Nor
  • Final Lower Thames Crossing approval awaited
    November 7, 2022
    Work in the UK includes a twin bore tunnel under the River Thames east of London.
  • Mott MacDonald’s Osprey keeps traffic flowing in Tyne and Wear
    May 18, 2018
    Mott MacDonald has been appointed by Tyne and Wear councils in northern England to upgrade their urban traffic management and control (UTMC) system. The existing Tyne and Wear UTMC system, which Mott MacDonald has been providing since 2010, monitors the busiest and most important parts of the region’s road transport network. This accounts for over 750,000 vehicle movements per day and more than 11,000 incidents, collisions and events annually.
  • Mott MacDonald delivers asset monitoring solution
    June 10, 2021
    Mott MacDonald is delivering an asset monitoring solution for Highways England.