Skip to main content

Transport Focus to sort out English road signs

Transport Focus is zeroing in on poorly maintained road signs in England.
By David Arminas March 18, 2020 Read time: 2 mins
Sort My Sign: Transport Focus is pushing for more accurate and informative road signs

The UK’s independent road user watchdog has launched a campaign called Sort My Sign to encourage England’s road users to report poor road signage.

England’s road authority, Highways England, manages more than 7,000km or motorways and major A roads.

Drivers can visit the Transport Focus website, enter a location, road name or postcode and enter details of the problem. Transport Focus will send it to Highways England on the road user’s behalf.

“We want to hear from road users about signs and information that aren’t up to scratch. We’ll use what you say to press Highways England to make journeys easier and safer,” said Anthony Smith, chief executive of Transport Focus.

“There is nothing more frustrating than missing your turnoff because the sign was hidden behind a tree or missing crucial information. While we have some of the safest roads there are still too many signs which are broken, confusing or out of date. If it’s not clear, it’s not safe.”

The Sort My Sign campaign aims to increase the usefulness and effectiveness of information on roads, including messages on electronic signs. This will allow more road users to make informed decisions in plenty of time, improving safety and reducing stress.

The examples sent in will be used to build up a map of issues across England and press for improvements for road users.

Transport Focus is calling for Highways England to mend broken or improve inaccurate signs as reported by road users. There is also a need top provide better information during delays and unexpected disruption. There should also be a review of the standards for signs on motorways and major A roads.

Related Content

  • Algeria signs off two contracts of Hauts Plateaux motorway work
    January 5, 2015
    The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway. No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months. Last March, World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minis
  • Reality check: Topcon’s Aptix
    July 20, 2023
    The biggest challenge facing construction professionals and general contractors is disconnected data and/or siloed data sources. The recently launched Aptix integration platform has broken down these silos, explains Topcon’s Scott Langbein.
  • Off road trials for electric highways technology
    August 11, 2015
    Following the completion of the feasibility study commissioned by Highways England into dynamic wireless power transfer technologies, off road trials of the technology needed to power electric and hybrid vehicles on England’s major roads are due to take place later this year. The trials are the first of their kind and will test how the technology would work safely and effectively on the country’s motorways and major A roads, allowing drivers of ultra-low emission vehicles to travel long distances without
  • Cutting congestion and improving transportation
    March 1, 2017
    CartoConsult is now working on a project to develop technology intended to reduce traffic congestion and improve transport services. This work forms part of a £4 million Department for Transport (DfT) initiative and the mapping software technology company has been selected by Swindon Borough Council, together with IT and networking company Cisco. This will be used to deliver an alert system for traffic managers to supply information on congestion.