Skip to main content

TransCore wins White Plains adaptive signal control system contract

TransCore wins White Plains adaptive signal control system contract. The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore that will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city's major arterials.
April 26, 2012 Read time: 2 mins
RSS5303 TransCore wins White Plains adaptive signal control system contract. The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore that will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city’s major arterials. Previous conventional traffic control techniques such as time-of-day signal timing and responsive timing plan selection were not able to accommodate all the variable and unpredictable traffic conditions experienced on the route.

Tarrytown Road in White Plains is a major arterial that carries around 50,000 – 60,000 vehicles daily and serves as a primary route for commuter access to and from downtown White Plains. The roadway experiences traffic surges because of significant downtown retail activity including six major downtown malls / retail centers and events at the Westchester County Center. Tarrytown Road is also the primary route when traffic is diverted from I-287. It experiences fluctuation in demand throughout the day with significant congestion during the morning and afternoon peak traffic hours.

The deployment, the result of a $250,000 cost-shared research agreement from the 5269 New York State Energy Research and Development Authority (NYSERDA) and the 1431 New York State Department of Transportation (NYSDOT), is intended to improve traffic flow and reduce carbon dioxide emissions along the corridor. The funding was made possible through the Low Carbon Transportation Alternatives Program Opportunity Notice, a partnership between NYSERDA and NYSDOT, to support programmes and technology that provide pathways to energy efficiency, enhanced economics, sustainability and improved livability throughout the state of New York.

Related Content

  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • IRF announces 2012 GRAA Winners
    October 15, 2012
    Organisations behind the Rio de Janeiro's RJ122 project; the Kosovo Motorway project; and New York City's State-of-the-Art ITS Infrastructure Deployment Program were among the winners of the International Road Federation’s (IRF) 2012 Global Road Achievement Awards (GRAA) competition. This year's awards, whose winners were announced by IRF chairman and mayor of Riyadh, H.E Abdullah A. Al-Mogbel, honour nine projects from countries across the globe, each leading the way in innovation and excellence in its res
  • GPS machine control systems reduce survey time
    February 14, 2012
    Innovative uses are being made of GPS technology, Mike Woof reports. US firms Creighton Manning Engineering and Delaney Construction have made a novel use of GPS technology in a project for the Route 85 Slingerlands bypass extension in the US.
  • South Carolina highway deal for Michael Baker International
    June 21, 2016
    Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County. The section of I-20 is a main artery into and