Skip to main content

TransCore wins White Plains adaptive signal control system contract

TransCore wins White Plains adaptive signal control system contract. The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore that will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city's major arterials.
April 26, 2012 Read time: 2 mins
RSS5303 TransCore wins White Plains adaptive signal control system contract. The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore that will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city’s major arterials. Previous conventional traffic control techniques such as time-of-day signal timing and responsive timing plan selection were not able to accommodate all the variable and unpredictable traffic conditions experienced on the route.

Tarrytown Road in White Plains is a major arterial that carries around 50,000 – 60,000 vehicles daily and serves as a primary route for commuter access to and from downtown White Plains. The roadway experiences traffic surges because of significant downtown retail activity including six major downtown malls / retail centers and events at the Westchester County Center. Tarrytown Road is also the primary route when traffic is diverted from I-287. It experiences fluctuation in demand throughout the day with significant congestion during the morning and afternoon peak traffic hours.

The deployment, the result of a $250,000 cost-shared research agreement from the 5269 New York State Energy Research and Development Authority (NYSERDA) and the 1431 New York State Department of Transportation (NYSDOT), is intended to improve traffic flow and reduce carbon dioxide emissions along the corridor. The funding was made possible through the Low Carbon Transportation Alternatives Program Opportunity Notice, a partnership between NYSERDA and NYSDOT, to support programmes and technology that provide pathways to energy efficiency, enhanced economics, sustainability and improved livability throughout the state of New York.

Related Content

  • St. Louis to deploy TransCore's TransSuite
    April 26, 2012
    Missouri Department of Transportation (MoDOT) has awarded TransCore a US$3.3 million contract to replace its existing traffic management software system and integrate the company's TransSuite traffic management software into the Gateway Guide programme, a system designed to relieve congestion and improve safety in the St. Louis area, the state’s largest city. With an existing TransSuite deployment in Kansas City, MoDOT looked to TransCore to bring its products to bear in their largest urban area. A detail
  • Most sophisticated active traffic management system in the US
    April 30, 2012
    TransCore has released further details of its involvement in New York City Department of Transportation's (NYCDOT) "Midtown in Motion" programme that launched the most advanced active traffic management (ATM) system in the US to improve the flow of traffic in a 110-square-block area in Manhattan.
  • FETC innovation from Highway Toll to ITS Taiwan smart city
    March 6, 2017
    FETC innovation from Highway Toll to ITS Taiwan smart city – a Global Road Achievement Award winner says IRF. The Far Eastern Electronic Toll Collection Company (FETC) has a bold vision for the future. FETC has achieved the most successful BOT project for ITS traf_ c management; it turns the traditional highway toll collection system into an integrated intelligent electronic toll collection (ETC) system for mobility management.
  • Mississippi road rebuild contract for Michael Baker
    March 6, 2018
    Michael Baker International has established a partnership with the Mississippi Department of Transportation (MDOT) to rebuilt a 13km stretch of US Route 49 in the Jackson area. The firm won the US$19.3 million Construction Engineering and Inspection (CE&I) contract in late 2017. Under the terms of the deal, the firm will prioritise safety, communication and efficiency to complete the project.