Skip to main content

Traficon technology to be deployed in Stockholm road tunnels

Video detection specialist Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules, which have been designed for automatic incident detection and traffic data analysis.
March 22, 2012 Read time: 2 mins
Video detection specialist 348 Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules, which have been designed for automatic incident detection and traffic data analysis.

The VIP-T video image processing board provides real-time data and image information for optimal traffic control and fast, accurate incident detection. Fast DSP processors allow various algorithms (tracking, motion detection, adaptive shadow suppression, etc.) to run simultaneously on one single board. This ensures high reliability and a low false alarm rate of the video detection system. The Traficon VIP-T uses MPEG4 image compression to offer full frame rate streaming video.

22 VIP-T video image processing modules have already been installed in the Södra Länken tunnel. In cooperation with traffic specialists 337 Swarco Sweden and ISG Systems AB Sweden, Traficon will install another 370 modules in the course of 2012. The installation of 393 VIP-T modules for the Norra Länken tunnel is expected to start after 2012 in cooperation with ISG Systems AB Sweden for delivery to Tunnelentreprenad AB, a consortium owned by 2927 Swarco Nordic and Rolf Tannergård.

Both Södra Länken and Norra Länken are new traffic routes that have been designed to help alleviate the increasing traffic volumes in and around Stockholm. The 6km long Södra Länken, of which 4.7 km is in tunnels, is the southern part of the Stockholm ring road and is the largest-ever road tunnel construction in Sweden. The construction of Södra Länken began in 1997 and was completed in 2004. The northern Norra Länken will be about 5km long and the major part of it will be in underground tunnels. Construction of Norra Länken started in 2006 and is expected to be completed by 2015.

For more information on companies in this article

Related Content

  • Paving lower temperature asphalt
    June 28, 2021
    Equipment from Vögele and Hamm has been used to build a carriageway with reduced-temperature asphalt in Germany. The equipment was required for paving a road tunnel in Kahrlsruhe. Tough conditions were applied to paving in the road tunnel under the Kriegsstrasse road.
  • Edeva makes Actibump available globally
    May 13, 2022
    Actibump lowers down into the road surface to create a speed bump only when speeding vehicles approach it.
  • Extended Traffic Control in 2014 and beyond
    April 3, 2014
    One leading traffic control solution company has announced a major acquisition to broaden its customer offer, while the delivery of an ambitious real-time journey information service for Scotland’s motorists is well on track. Guy Woodford reports Kapsch’s TrafficCom says its high-profile recent US$16 million acquisition of Transdyn will enable it to offer current and future customers worldwide an extended end-to-end product and solution portfolio for intelligent transport systems (ITS). The acquisitio
  • Connectivity is key for contractors
    November 8, 2022
    Michigan Department of Transportation (MDOT) has planned its US$210 million I-69 Rebuild Project in Eaton and Calhoun Counties, work that will improve journeys for drivers in the area