Skip to main content

Traficon technology to be deployed in Stockholm road tunnels

Video detection specialist Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules, which have been designed for automatic incident detection and traffic data analysis.
March 22, 2012 Read time: 2 mins
Video detection specialist 348 Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules, which have been designed for automatic incident detection and traffic data analysis.

The VIP-T video image processing board provides real-time data and image information for optimal traffic control and fast, accurate incident detection. Fast DSP processors allow various algorithms (tracking, motion detection, adaptive shadow suppression, etc.) to run simultaneously on one single board. This ensures high reliability and a low false alarm rate of the video detection system. The Traficon VIP-T uses MPEG4 image compression to offer full frame rate streaming video.

22 VIP-T video image processing modules have already been installed in the Södra Länken tunnel. In cooperation with traffic specialists 337 Swarco Sweden and ISG Systems AB Sweden, Traficon will install another 370 modules in the course of 2012. The installation of 393 VIP-T modules for the Norra Länken tunnel is expected to start after 2012 in cooperation with ISG Systems AB Sweden for delivery to Tunnelentreprenad AB, a consortium owned by 2927 Swarco Nordic and Rolf Tannergård.

Both Södra Länken and Norra Länken are new traffic routes that have been designed to help alleviate the increasing traffic volumes in and around Stockholm. The 6km long Södra Länken, of which 4.7 km is in tunnels, is the southern part of the Stockholm ring road and is the largest-ever road tunnel construction in Sweden. The construction of Södra Länken began in 1997 and was completed in 2004. The northern Norra Länken will be about 5km long and the major part of it will be in underground tunnels. Construction of Norra Länken started in 2006 and is expected to be completed by 2015.

For more information on companies in this article

Related Content

  • Sweden appoints Veidekke Anläggning to Förbifart Stockholm work
    May 2, 2019
    Sweden’s transport administration Trafikverket has appointed Veidekke Anläggning as a temporary contractor for work on the Lovön section of the Stockholm Bypass - Förbifart Stockholm. The deal is worth around €9.6 million. The contractor will take over work started by a tender winner whose contract has been cancelled, according to Swedish media. It is expected the new contractor will be on site until the end of the year, by which time Trafikverket says it hopes to have re-tendered the remaining work.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains
  • The paperless construction site
    August 9, 2019
    Digitalization is changing the construction industry faster than expected. Automation, additional sensors and the networking of machines make it possible to exploit optimization potential and noticeably increase productivity. However, despite innovative working methods and digitization, the road construction process is still mainly based on one medium: paper. Paper can be used for a wide variety of purposes and offers unlimited flexibility. Construction schedules, work schedules, work sheets, mix orders