Skip to main content

Traficon technology to be deployed in Stockholm road tunnels

Video detection specialist Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules, which have been designed for automatic incident detection and traffic data analysis.
March 22, 2012 Read time: 2 mins
Video detection specialist 348 Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules, which have been designed for automatic incident detection and traffic data analysis.

The VIP-T video image processing board provides real-time data and image information for optimal traffic control and fast, accurate incident detection. Fast DSP processors allow various algorithms (tracking, motion detection, adaptive shadow suppression, etc.) to run simultaneously on one single board. This ensures high reliability and a low false alarm rate of the video detection system. The Traficon VIP-T uses MPEG4 image compression to offer full frame rate streaming video.

22 VIP-T video image processing modules have already been installed in the Södra Länken tunnel. In cooperation with traffic specialists 337 Swarco Sweden and ISG Systems AB Sweden, Traficon will install another 370 modules in the course of 2012. The installation of 393 VIP-T modules for the Norra Länken tunnel is expected to start after 2012 in cooperation with ISG Systems AB Sweden for delivery to Tunnelentreprenad AB, a consortium owned by 2927 Swarco Nordic and Rolf Tannergård.

Both Södra Länken and Norra Länken are new traffic routes that have been designed to help alleviate the increasing traffic volumes in and around Stockholm. The 6km long Södra Länken, of which 4.7 km is in tunnels, is the southern part of the Stockholm ring road and is the largest-ever road tunnel construction in Sweden. The construction of Södra Länken began in 1997 and was completed in 2004. The northern Norra Länken will be about 5km long and the major part of it will be in underground tunnels. Construction of Norra Länken started in 2006 and is expected to be completed by 2015.

For more information on companies in this article

Related Content

  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • Versatile traffic camera to boost safety
    August 14, 2017
    Siqura is offering the TrafficPTZ Ultimo, a Pan Tilt Zoom camera that is said to be optimised to meet traffic and infrastructure demands. A nove feature is the embedded processing, which allows third party application software such as analytics to run on it. The unit is claimed to be an all-IP camera with a robust design that features fast and accurate positioning. It also has no backlash, a large zoom lens and is easy to install. The camera responds automatically to information from roadside sensors such a
  • Cost expectations increase for Stockholm Bypass project
    February 6, 2024
    The cost for Stockholm Bypass project could be up to €4.7 billion.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.