Skip to main content

Texas highway underway

Work is now well underway on the new North Tarrant Express project in Texas.
February 23, 2012 Read time: 1 min
Work is underway on the new north Tarrant Express project in Texas
Work is now well underway on the new North Tarrant Express project in Texas. Clearance operations are being carried out to make way for the North Tarrant Express, a project that consists of a series of major improvements to the I-820 and SH 121/183 (Airport Freeway) highway corridor in northeast Tarrant County. The US$2 billion project is due to be completed in 2015. This project is intended to help reduce traffic congestion, improve safety and increase capacity in one of the country's fastest-growing regions. In addition to the design, right of way and utilities, the project will rebuild and expand 13 miles along I-820 and SH 121/183 from I-35W to the SH 121 split. This project will rebuild the existing four to six main lanes, add four toll-managed lanes, plus frontage roads and auxiliary lanes to double existing capacity. The project also includes two additional non-tolled main lanes which will also be added no later than 2030 at no additional cost. This PPP is using a combination of private funds with public funds to complete the 21km corridor in five years.

Related Content

  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.
  • Asphalt advances and industry innovations in paving
    May 20, 2014
    Asphalt paving technology continues to develop, benefiting from new technologies and new diesel engines - Mike Woof reports The asphalt paving equipment market is seeing the introduction of new low emission engines that will meet the Tier 4 Final regulations for Europe and North America. These have required some major engineering changes, with firms now having to install bulky exhaust after-treatment systems and additional cooling for engines and turbos.
  • First national study of US travel time reliability
    April 30, 2012
    Texas Transportation Institute (TTI) has published the 2011 Congested Corridors Report, the first nationwide effort to identify reliability problems at specific stretches of US highway responsible for significant traffic congestion at different times and different days. Researchers noted that the corridors included in the report were identified by the data itself.
  • Global credit squeeze impacts Australia's road construction
    July 13, 2012
    Roads Australia steps up in policy debate as road construction feels the pinch of the credit squeeze, as Mark Bowmer (RA media director) reports Like all markets around the world, Australia is feeling the effects of the global credit squeeze and its impact on the delivery of major infrastructure projects such as roads. In Sydney, for example, lack of funding (both from government and private sources) is seen as the major stumbling block to the construction of a much-needed eastern extension to Sydney's main