Skip to main content

Telvent wins Brisbane ITS contract

Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.
May 3, 2012 Read time: 2 mins
RSS3344 Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.

Brisbane’s metropolitan area has seen strong population growth over the past decade. As the region continues to grow, it continues to put pressure on Brisbane’s already congested road network. Legacy Way completes the missing link of motorway standard road between Brisbane’s Centenary Motorway and the Inner City Bypass (ICB).

The Legacy Way project will deliver long-term benefits including reducing congestion on surface roads and cutting through traffic on local streets, enhancing the region’s pedestrian and cycle networks and providing a direct, reliable, high-speed route between the Western Freeway and the airport.

Telvent will install its SmartMobility Road Suite, based on its own supervisory control and data acquisition (SCADA OASyS), which allows centralisation of tunnel infrastructure and traffic management and provides operators with a set of effective tools to facilitate the process, while improving safety and security at the same time. The solution will enable traffic operators to control traffic in real time and be prepared to respond quickly and effectively to any incident or emergency situation occurring within the tunnel, once it opens.

“We are pleased to have the opportunity to work with Transcity JV on the Legacy Way project, which will lead to better traffic flow management in the Brisbane metropolitan area,” stated Ignacio Gonzalez, Telvent´s chairman and CEO. “This project will assist local authorities in their commitment to optimize urban mobility in the interests of creating a safer and more pleasant environment for citizens, thereby improving their quality of life”.

For more information on companies in this article

Related Content

  • NSW Australia investing in transport
    June 20, 2013
    Australia’s New South Wales (NSW) Government has outlined its massive transportation investment in the WestConnex project. This will be the largest urban transport project in the history of New South Wales. Some A$1.8 billion will be invested over four years from Restart NSW, the state’s new infrastructure fund. to finance the WestConnex project. And A$111 million will be committed in 2013-14 to get work underway on the 33km motorway. The NSW Government will fund the initial sections of the motorway. Privat
  • Lumitex lights up Melbourne's EastLink tunnels
    June 18, 2021
    The 1,066 high-pressure sodium lights have been exchanged for 1,174 Lumitex LEDs throughout the EastLink network's 1.6km twin tunnel complex in Melbourne, Australia.
  • Free flow tolling technology is booming
    April 10, 2013
    Jon Masters reports on the latest moves in the free-flow tolling segment. Free-flow tolling of roads and discrete infrastructure, such as bridges and tunnels, is an area of transportation that appears to be booming. Tolling in general is on the up, often still as a means for funding road projects where public sector budgets can no longer cover the necessary costs, but not exclusively so. Several high profile examples of road user charging for ‘demand management’ – the reduction of congestion as part of a wi
  • Australian Institute of Landscape Architects (AILA) anger over East West Link
    August 6, 2013
    The Australian Institute of Landscape Architects (AILA) fear the design of the proposed multi-billion dollar East West Link highway in Melbourne will have a “substantial visual, environmental and amenity” impact on peoples quality of and the open spaces they enjoy. Kirsten Bauer, president of the AILA Victorian Chapter, has attacked the plans for the 18km tolled motorway, set to run from the western suburbs to the Eastern Freeway, after she and other Victorian AILA members had reviewed the “so called detai