Skip to main content

Telvent wins Brisbane ITS contract

Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.
May 3, 2012 Read time: 2 mins
RSS3344 Telvent GIT has been awarded a contract by the Transcity JV, with Brisbane City Council as the end customer, to implement the ITS for Legacy Way (formerly Northern Link) in Australia. Legacy Way is a 4.6km road tunnel that will connect Brisbane’s western and inner northern suburbs, delivering travel time savings of up to 44 per cent when it opens. The ITS contract is valued at around US$32 million.

Brisbane’s metropolitan area has seen strong population growth over the past decade. As the region continues to grow, it continues to put pressure on Brisbane’s already congested road network. Legacy Way completes the missing link of motorway standard road between Brisbane’s Centenary Motorway and the Inner City Bypass (ICB).

The Legacy Way project will deliver long-term benefits including reducing congestion on surface roads and cutting through traffic on local streets, enhancing the region’s pedestrian and cycle networks and providing a direct, reliable, high-speed route between the Western Freeway and the airport.

Telvent will install its SmartMobility Road Suite, based on its own supervisory control and data acquisition (SCADA OASyS), which allows centralisation of tunnel infrastructure and traffic management and provides operators with a set of effective tools to facilitate the process, while improving safety and security at the same time. The solution will enable traffic operators to control traffic in real time and be prepared to respond quickly and effectively to any incident or emergency situation occurring within the tunnel, once it opens.

“We are pleased to have the opportunity to work with Transcity JV on the Legacy Way project, which will lead to better traffic flow management in the Brisbane metropolitan area,” stated Ignacio Gonzalez, Telvent´s chairman and CEO. “This project will assist local authorities in their commitment to optimize urban mobility in the interests of creating a safer and more pleasant environment for citizens, thereby improving their quality of life”.

For more information on companies in this article

Related Content

  • EastLink demonstrates hands-free driving in Melbourne
    April 10, 2018
    A motorway operator in Australia’s Victoria state has televised a live demonstration of automated driving along a section of one of its roads. The demonstration was along a route of the EastLink, an electronically tolled section of the M3 freeway through the eastern and south-eastern suburbs of Melbourne. EastLink is part of Melbourne's Metropolitan Ring Road project. ConnectEast is an Australian company responsible for the finance, design, construction and operation of EastLink which cost nearly US$2 bi
  • Albanian road investment
    May 15, 2012
    The European Bank for Reconstruction and Development (EBRD) is providing major funding in Albania’s road network. A loan worth €53 million will help pay for the construction of the new Fier and Vlore bypasses. This loan will aid further development of the Albanian road network and boosting economic integration in the country by co-financing the construction of the two bypass roads, located in south-western Albania. The EBRD loan is structured in two tranches and will be used by the Albanian Road Authority t
  • China's Roads Convention focuses on sustainability
    February 9, 2012
    IRF joins with key Chinese transport authorities to lead the way in efforts to make sustainable rural mobility, transport and access a reality for millions throughout the world.
  • New road reduces Carlisle congestion by 20%
    May 11, 2012
    Carlisle, in north-west England, has seen as 20% reduction in congestion since the opening of the city’s US$284million (£176m) Northern Development Route in February this year. Around 10,000 vehicles a day are using the new road, which is broadly in line with the predictions made by highways engineers when building a case to construct a new route connecting the A595 with the M6 around the western flank of the city. Traffic counters positioned on the new road show an average of 9,583 vehicles a day along the