Skip to main content

Tackling congestion on Arkansas link

Engineering firm Michael Baker International has helped deliver highway improvements for a key link in Arkansas. The upgrade to Highway 70 involves widening and is designed to boost capacity along a 30km stretch of the route.
June 14, 2017 Read time: 1 min

Engineering firm Michael Baker International has helped deliver highway improvements for a key link in Arkansas. The upgrade to Highway 70 involves widening and is designed to boost capacity along a 30km stretch of the route. Michael Baker International completed a US$4.5 million design project for the Arkansas State Highway and Transportation Department (AHTD) is for widening of the section of Highway 70 from two lanes to four.

The firm carried out an environmental study and provided roadway widening design. This included replacement of the existing Caney Creek Bridge and two bridges over Ten Mile Creek. The firm came up with a design to widen and corrected deficiencies in road curve radii and super-elevation, flattening subgrade slopes on the low side of super-elevated sections to minimise ditch depths and right-of-way takes. The firm also designed a solution to add a long sweeping curve at the existing intersection with the I-30 Frontage Road to allow trucks to safely use the intersection for turns.

Related Content

  • Texas highway underway
    February 23, 2012
    Work is now well underway on the new North Tarrant Express project in Texas.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • UK smart motorway work for M4 link
    September 16, 2019
    Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la