Skip to main content

Swarco signs for slower Swansea speed limit

In March, the Welsh government passed a law which from September will see the default speed limit on restricted roads in Wales reduced from 30mph (50kph) to 20mph (32kph).
By David Arminas June 30, 2023 Read time: 2 mins
The signs are all being manufactured and rigorously tested at Swarco’s factory in Melsonby in the English county of North Yorkshire (image courtesy Swarco UK & Ireland)

Swarco has signed an agreement with the Welsh city of Swansea to design and install signage to support the new 32kph (20mph) urban speed limit.
 
In March, the Welsh government passed a law which from September will see the default speed limit on restricted roads in Wales reduced from 30mph (50kph) to 20mph. To support the upcoming changes to the speed limit, local authorities in Wales are working to make the necessary alterations to existing highway signage to ensure drivers are aware of the changes.
 
Following an open competitive tender process on Sell2Wales in late 2022, Swansea Council entered into a commercial contract with Swarco to replace its existing vehicle speed activated signs (VAS) with new electronic sign units that dynamically display the approaching vehicle’s actual speed. These signs will display the vehicle speed in ‘GREEN’ if the vehicle is complying with the new default speed limit and in ‘RED’ if not. This new contract is designed to work in co-ordination with an existing service and maintenance contract which was already in place.
 
The new agreement will see Swarco install 120 bespoke vehicle activated signs throughout Swansea. The signs, which are all manufactured and rigorously tested at Swarco’s factory in Melsonby in the English county of North Yorkshire, feature Swarco’s EPIX lens technology system to ensure the lowest power consumption.
 
The signs use a radar to detect vehicle speeds and use an energy efficient LED display to clearly show messages to oncoming drivers, as well as being equipped with highly intelligent internal data logging, which is stored within the signs, to provide statistical feedback and data on the number of activations, vehicle speeds and volumes. The council will be able to easily monitor changing driver behaviour.
 
“We are pleased to further extend our working relationship with Swansea Council,” said Derek Williamson, business development manager at Swarco UK & Ireland. “We have worked closely with them to fully understand their requirements and have designed a high quality, reliable, durable and energy efficient solution that delivers a low lifetime cost.”

For more information on companies in this article

Related Content

  • Muscat Airport contract for Cooper
    February 9, 2012
    A huge project in Oman will see a proposed new terminal at Muscat International Airport, which has been budgeted at US$1.17 billion, completed by 2014. It will have the capacity to handle 12 million passengers annually, and further expansions planned by The Ministry of Transport and Communication in three subsequent phases will ultimately boost the airport’s capacity to 48 million passengers annually by 2050.
  • Cross safely with the SR-CROSSLED-S by Sernis
    August 31, 2021
    Similar to normal road studs, Sernis' SR-CROSSLED-S can be controlled with a PC500 unit.
  • Tarmac secures major UK highways contract
    February 7, 2013
    Tarmac has been awarded a major US$94 million (£60mn) highways contract from Nottinghamshire County Council (CC) in central England. The contract, which involves the delivery of a wide range of highways services including resurfacing, gulley cleaning, street lighting, road marking and earthworks will see Tarmac’s National Contracting division working in partnership with the local authority’s in-house highways team. The agreement, which will start on 1 April 2013 and run until 31 March 2018 with a five-year
  • SaMoTer technology award scheme opening
    July 3, 2019
    The organisers of the SaMoTer Italian construction machinery exhibition are running a technology award during the run-up to next edition. The exhibition will be held at the Verona Exhibition Centre 21st 25th March 2020. The closing date for entries in the 23rd Innovation Award is 28th October 2019. The event now offers more categories to ensure better representativeness of the construction machinery sector. Construction companies, official representatives or importers, research institutions and bodies, un