Skip to main content

SWARCO sets up live-lane running in Germany

SWARCO’s system spans 2.8km along the hard shoulder of the A8 motorway between Karlsruhe and Karlsbad in southwest Germany.
By David Arminas February 28, 2023 Read time: 2 mins
The set up consists of four display cross-sections with LED variable VMS, eight pole installations for VMS or camera technology as well as 12 route stations (image courtesy Autobahn GmbH Niederlassung Südwest)

SWARCO has installed a temporary hard shoulder clearance, or live-lane running system, on the A8 motorway in southwest Germany for the Die Autobahn highways agency.

The A8 motorway is an important central east-west link in the European transport network. The section between Karlsruhe motorway interchange and Karlsbad junction features a winding route and gradients of around 7.5 per cent and is highly congested with about 110,000 vehicles per day. Traffic flow is often blocked in this section due to slow-moving trucks and there are frequently overtaking manoeuvres and lane changes taking place.

SWARCO’s system spans 2.8km along the motorway between Karlsruhe and Karlsbad. It consists of four display cross-sections with LED variable message signs (VMS), eight pole installations for VMS or camera technology as well as 12 route stations. In addition to the outdoor equipment, SWARCO also provides central control software.

The camera technology is from Fuunkwerke video systeme while the operation of all functions is managed by the Autobahn GmbH traffic control centre in Stuttgart. Before the hard shoulder lane becomes a live lane, it must be checked by the traffic control centre to ensure that no obstacles are blocking the lane.

SWARCO says that the system offers a climate- and resource-friendly possibility for using existing infrastructure more effectively without the need for costly and more permanent expansion of that infrastructure. In fact, notes SWARCO, the capacity of the infrastructure can increase up to 30 per cent with such a system.

The first live-lane running took place early last December.

The introduction of live-lane usage on hard shoulders has been controversial among highway safety experts and the public. Early last year, the UK stopped implementation of its so-called smart motorway schemes until safety data has been collected over five years, according to the Department for Transport.

The department said that during this time it will invest €1.08 billion (£900 million) to improve safety on existing All Lane Running motorways. The rollout of new ALR smart motorways will be paused for schemes introduced before 2020. After this five-year period, the government will assess the data and make an informed decision on next steps, it said.

According to the government, although available data shows smart motorways are comparatively the safest roads in the country in terms of fatality rates, “the government will go further by ensuring current smart motorways without a permanent hard shoulder are equipped with best-in-class technology and resources to make them as safe as possible”.

 

 

For more information on companies in this article

Related Content

  • Weigh-in-motion market set to rise globally
    February 14, 2023
    The analyst Research and Markets predicts a compound annual growth rate of 10 per cent up to 2027 with Europe leading the demand.
  • Variable message signs emerging from the shadows
    July 8, 2016
    Variable message signs are increasingly seen on the world’s motorways. World Highways looks at some of the latest developments UK manufacturer of temporary, solar powered variable message signs, Bartco UK, has unveiled what it says is the first temporary VMS designed for use within work zones. Bartco said that its HD Quattro was developed in response to feedback from customers requiring a product to affirm on-site speed limits for work zone vehicles. The unit is designed to show limited amounts of inform
  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.
  • UK's M25 junction works planned
    May 25, 2022
    The UK government is planning two contracts on London’s orbital M25 motorway.