Skip to main content

Storstrøm Bridge JV asks for extension

The original estimated cost was around €280 million for the 4km cable-stay structure when the contract was awarded by the Danish Road Directorate (Vejdirektoratet).
By David Arminas July 13, 2023 Read time: 2 mins
The Storstrøm Bridge will have an electrified two-track railway, a two-lane road and foot and cycle paths (image courtesy Danish Road Directorate / Vejdirektoratet)

Italian consortium Storstrøm Bridge Joint Venture has proposed a 27-month extension and an additional €454 million (US$502 million) for completion of Denmark’s new Storstrøm Bridge.

The original estimated cost was around €280 million for the 4km-long 26m-wide single-support cable-stay structure when the contract was awarded by the Danish Road Directorate (Vejdirektoratet) in 2018. But delays to construction start caused by Covid and other cost increases has gradually pushed up the price of the new structure that run nearby to the exiting Storstrøm Bridge.

The main contractors in the Italian Storstrøm Bridge Joint Venture are Itinera, Grandi Lavori Fincosit and Condotte. The new double-track road and railway bridge includes a central cable-stayed bridge with two spans, 320m long and two access viaducts with 44 spans of 80m, for a total length of nearly 4km. It will have an electrified two-track railway for trains running at 200km/h and a two-lane road with a speed limit of 80km/h. The bridge will also have a foot and cycle paths.

The old bridge, due for demolition when the new one opens, is a 3.2km, a road and railway arch structure opened in 1937 across the Storstrømmen strait between the islands of Falster and Masnedø.

For more information on companies in this article

Related Content

  • Major new bridge link discussed for Denmark
    November 16, 2012
    Discussions are in hand in Denmark over the proposed project to build a new bridge over Storstrøm that would link the islands of Zealand and Falster. While there is agreement that the bridge would prove beneficial to the islanders, the source of financing for the project has proved rather more troublesome for Denmark’s political parties. While the Danish Government is keen to source the €523 million needed from unused funds for the country’s railway network, a number of opposition parties want to finance th
  • Emovis continues with Mersey Gateway tolling
    March 18, 2022
    Emovis provides collection of tolls and charges for both Mersey Gateway Crossing and the older 87m-long Silver Jubilee Bridge through its merseyflow brand name.
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • Danish SolarFuture builds solar facility by Öresund Bridge
    January 10, 2018
    Solar cell panels worth around €270,000 will produce energy for the Øresund Bridge that connects Denmark and Sweden. Danish companies SolarFuture and Solarpark DK have been awarded the contract to install 1,500m² solar panels near the toll station of the Øresund Bridge. The three-year agreement is with Øresundsbro Konsortiet - the Danish-Swedish company that owns and operates the Øresund Bridge. The panel will generate around 4% of the power to operate the bridge, including deck lighting and