Skip to main content

Stantec wins California roads study

Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the US State of California.
February 28, 2012 Read time: 2 mins
Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the 972 US State of California. The 3300 Orange County Transportation Authority (OCTA) has selected Stantec to carry out two long-term projects that affect traffic density on sections of the 91 Freeway and Interstate 405 (I-405). Stantec's Irvine office will lead the work, which is expected to begin in July 2011 and continue into 2012.

On I-405, Stantec will carry out a plan by the OCTA vision to design a continuous access system, which will allow commuters to enter or exit at will from the existing HOV lane between the 73 toll road and Interstate 5 interchanges. Work on this project will include the preparation of plans, specifications and estimates; a project study report; and environmental documentation; among other elements. On the 91 freeway, Stantec will carry out a comprehensive study on the stretch lying between the 55 and 57 freeways. This will investigate the feasibility of adding additional road capacity, including an additional, mainline lane and will include preliminary design and operational characteristics.

This study will also look at improvements for the 55 and 91 freeway interchange complex as well as the evaluation of overall road capacity needs between the two major interchanges.

For more information on companies in this article

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • Barrier innovation putting traffic safety and flow first
    April 3, 2014
    Cutting-edge barriers offering greater safety at the same time as limiting traffic disruption are proving in demand on busy world highways, as Guy Woodford reports Small footprint; minimum disruption after impact; lower labour costs; all said to be elements contributing to the growing popularity of the Trend terminal from Trinity Highway Products. This family of end terminals offers a range of safe and efficient solutions to barrier ends with quick and easy assembly and installation. Trinity claims th
  • Miami interstate highway redesign project commencing
    January 18, 2019
    Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha