Skip to main content

Stantec wins California roads study

Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the US State of California.
February 28, 2012 Read time: 2 mins
Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the 972 US State of California. The 3300 Orange County Transportation Authority (OCTA) has selected Stantec to carry out two long-term projects that affect traffic density on sections of the 91 Freeway and Interstate 405 (I-405). Stantec's Irvine office will lead the work, which is expected to begin in July 2011 and continue into 2012.

On I-405, Stantec will carry out a plan by the OCTA vision to design a continuous access system, which will allow commuters to enter or exit at will from the existing HOV lane between the 73 toll road and Interstate 5 interchanges. Work on this project will include the preparation of plans, specifications and estimates; a project study report; and environmental documentation; among other elements. On the 91 freeway, Stantec will carry out a comprehensive study on the stretch lying between the 55 and 57 freeways. This will investigate the feasibility of adding additional road capacity, including an additional, mainline lane and will include preliminary design and operational characteristics.

This study will also look at improvements for the 55 and 91 freeway interchange complex as well as the evaluation of overall road capacity needs between the two major interchanges.

For more information on companies in this article

Related Content

  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Israel tolled lane projects delayed
    August 10, 2018
    The tender process for the construction of tolled lanes around Tel Aviv now looks set to be delayed. The additional lanes are planned to be built at key points on the network around Tel Aviv in a bid to cut congestion. An earlier project for a tolled lane in the Tel Aviv area, linking the Shappirim Interchange with the centre of the city, has proven highly successful at helping to reduce congestion levels. The three new sections are intended to further improve traffic flow in and around the city. These lane
  • Rapid replacement of multiple bridges – the plan
    December 14, 2017
    The US State of Pennsylvania is saving itself $220 million over 10 years on a programme to replace 558 bridges with an unusual public private partnership approach - Kristina Smith writes It is called the Rapid Bridge Replacement Programme with good reason. Pennsylvania’s Department of Transport, PennDOT, wants to see no less than 558 structurally deficient bridges replaced with newly designed and constructed ones, all within four years. Using traditional forms of procurement this programme would be like