Skip to main content

Stantec wins California roads study

Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the US State of California.
February 28, 2012 Read time: 2 mins
Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the 972 US State of California. The 3300 Orange County Transportation Authority (OCTA) has selected Stantec to carry out two long-term projects that affect traffic density on sections of the 91 Freeway and Interstate 405 (I-405). Stantec's Irvine office will lead the work, which is expected to begin in July 2011 and continue into 2012.

On I-405, Stantec will carry out a plan by the OCTA vision to design a continuous access system, which will allow commuters to enter or exit at will from the existing HOV lane between the 73 toll road and Interstate 5 interchanges. Work on this project will include the preparation of plans, specifications and estimates; a project study report; and environmental documentation; among other elements. On the 91 freeway, Stantec will carry out a comprehensive study on the stretch lying between the 55 and 57 freeways. This will investigate the feasibility of adding additional road capacity, including an additional, mainline lane and will include preliminary design and operational characteristics.

This study will also look at improvements for the 55 and 91 freeway interchange complex as well as the evaluation of overall road capacity needs between the two major interchanges.

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.
  • California turns towards a Texas solution for u-turn design
    July 24, 2019
    The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
  • $78 million Granite contract in CA
    February 17, 2025
    Granite construction is working on a $78 million contract in CA.